Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published July 3, 2025 at 8:00 PM
Updated July 4, 2025
Demolition, site work and addition to a mixed-use development in Fort Wayne, Indiana. Completed plans call for the addition of a educational facility; for the demolition of a educational facility; and for site work for a educational facility.
East Allen County Schools (EACS) (the "Owner") and Weigand Construction Co., Inc. ("Construction Manager" or the "CMc"), 7808 Honeywell Drive, Fort Wayne, Indiana 46825, have entered into a contract pursuant to which Weigand Construction will be providing all of the Construction Manager as Constructor services in connection with the Additions & Renovations at Paul Harding Junior High & East Allen University (EAU). Accordingly, Weigand Construction will be receiving sealed bids from pre-qualified contractors, as determined by Weigand Construction in its sole and complete discretion, for the work and supply of ma-terials for the Additions & Renovations at Paul Harding Junior High & East Allen Uni-versity (EAU) (the "Project"). Each bid shall include with such bid, a certified check or bid bond made payable to Weigand Construction Co., Inc. for an amount not less than five percent (5%) of the maximum bid. Should a successful bid-der withdraw its bid or fail to execute a satisfactory subcontract with the CMc, Weigand Construction may then declare the bid deposit or bid bond to be forfeited as liquidated dam-ages. Each successful bidder may be required to furnish Perform-ance & Payment Bonds (if Al-ternate Bid regarding Bonds is accepted) which cover faithful performance of the contract and the payment of all obliga-tions arising thereunder (if Alternate Bid regarding Performance Bond is accepted, it will be made out to Weigand Construction Co., Inc.). Said bonds shall remain in full force and ef-fect for one year from the sub-stantial completion of the work. A bidder's ability to provide said bonds is a condition precedent to bidding the Project, and any bid submitted without an alternate cost for providing said bonds may be determined as non-responsive by Weigand Construction, in its sole and complete discretion, and rejected by Weigand Construction. Document Note: Bidders may be required by Weigand Construction, if set forth in the construction and bidding documents, to confirm or submit for pre-qualification status prior to receiving digital access to construction and bid-ding documents. Bidders desiring printed documents shall pay for their own cost of printing, shipping, and handling.
Post-Bid
Educational
$4,000,000.00
Public - County
Addition, Demolition, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 11, 2025
August 11, 2025
6501 Wayne Trce, Fort Wayne, IN
Related To This Project
Fort Wayne, IN
Bid Date: Jun 26 2025
Fort Wayne, IN
Bid Date: Jun 20 2025
Fort Wayne, IN
Bid Date: Jun 13 2025
Fort Wayne, IN
Bid Date: May 30 2025
Fort Wayne, IN
Bid Date: Jun 26 2025
Fort Wayne, IN
Bid Date: Jun 26 2025
Fort Wayne, IN
Bid Date: Jun 19 2025
Fort Wayne, IN
Bid Date: Jul 09 2025
Fort Wayne, IN
Bid Date: Jun 09 2025
Fort Wayne, IN
Bid Date: May 27 2025
Fort Wayne, IN
--
Fort Wayne, IN
--
Fort Wayne, IN
Bid Date: Dec 10 2025
Fort Wayne, IN
Bid Date: May 29 2025
Fort Wayne, IN
Bid Date: May 29 2025
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
