BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published June 4, 2025 at 8:00 PM

Updated June 5, 2025

Site work for a power facility in Lancaster, Tennessee. Completed plans call for site work for a power facility.

Usace Center Hill and Cordell Hull Power Plant Breaker Repair The work shall consist of furnishing all labor, materials, and equipment necessary to refurbish and deliver two (2) Eaton 150VCP-WG50-3000A Vacuum Circuit Breakers (VCB), property of the US Government. The VCB's have been provided to Eaton for evaluation and refurbishment. Following refurbishment, the contractor shall return one (1) Eaton 150VCP-WG50-3000A VCB to Center Hill Dam Power Plant, and one (1) Eaton 150VCP-WG50-3000A VCB to Cordell Hull Dam Power Plant as described below. The breakers must be compatible with existing USACE switchgear.

Post-Bid

Power Plant

$100,000.00

Public - Federal

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
133
Active Projects
68
Bidding Soon
846
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 4, 2025

June 13, 2025

Project location map

270 Lancaster Rd, Lancaster, TN


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.