Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published June 30, 2025 at 8:00 PM
Updated July 9, 2025
Renovation of a water / sewer project in Charleston, Tennessee. Completed plans call for the renovation of a water / sewer project.
The work consists of: Removal and disposal of water treatment plant sludge in existing lagoons. The Contractor shall conform to all applicable local, State and Federal laws, rules and regulations; be responsible for jobsite safety and means and methods; supply all labor, equipment and materials; shall be responsible for identifying and contracting with a proper disposal facility; conforming with facility requirements; paying for all disposal costs; and providing documentation as described in the specifications. The contract is for a one-year term, with the option to renew for four (4) additional one-year terms. The contract period per term is: a maximum of 120 calendar days for substantial completion (sludge removal completion) and 180 days to final completion, both from the date of the notice to proceed for that year. However, once the contractor mobilizes to the site, the contractor has 45 days to complete the sludge removal (that, to obtain substantial completion), and another 60 days to achieve final completion such that the 45 days falls within the 120 days. Questions about this procedure shall be directed to the Designer at: Owen and White, Inc.; David Kozan, P.E., Email: dkozan@owenandwhite.com; Phone Number: (225) 926-5125. Question Deadline 06/12/2025 Questions received less than seven days prior to the date for opening of Bids may not be answered. All questions about the meaning or intent of the Bidding Documents are to be submitted to Engineer in writing. Bid security in the amount of 5% of the Bid must accompany each Bid in accordance with the Instructions to Bidders. The Owner reserves the right to waive any informalities or to reject any and all bids. No bid may be withdrawn within 45 days after the scheduled time for receipt of bids.
Post-Bid
Water / Sewer
$300,000.00
Public - City
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
13
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 8, 2025
August 7, 2025
Multiple Locations, Charleston, TN
Related To This Project
Charleston, TN
Bid Date: Jun 24 2025
Charleston, TN
Bid Date: Jun 19 2025
Charleston, TN
Bid Date: Sep 04 2025
Charleston, TN
Bid Date: Sep 09 2025
Charleston, TN
Bid Date: Nov 06 2025
Charleston, TN
Bid Date: Dec 05 2025
Charleston, TN
Bid Date: Nov 21 2025
Charleston, TN
Bid Date: Dec 16 2025
Charleston, TN
Bid Date: May 09 2025
Charleston, TN
Bid Date: Jul 24 2025
Charleston, TN
--
Charleston, TN
Bid Date: Feb 07 2025
Charleston, TN
Bid Date: Jun 12 2024
Charleston, TN
Bid Date: Apr 25 2024
Charleston, TN
Bid Date: Feb 22 2022
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
