Published June 4, 2025 at 8:00 PM

Updated June 21, 2025

This is a service / maintenance or supply contract in Minturn, Colorado. Contact the soliciting agency for additional information.

The Town of Minturn is soliciting firm price proposals for supplying a membrane Microfiltration/Ultrafiltration (MF/UF) system for the Minturn WTP Project based on the information provided in this Request for Proposal (RFP). PROJECT DESCRIPTION AND BACKGROUND Minturn presently operates a direct filtration WTP consisting of three slow sand filters. Filter 1 and Filter 2 are earthen pits constructed in 1963. Filter 1 is no longer in service, and Filter 2 feeds a 1.0- micron cartridge filter capable of producing 50 gpm of treated water. Filter 3 is a concrete lined filter constructed in 1991, capable of producing 60 gpm. Water treated through Filter #3 and the cartridge filter comes from a surface water diversion on Cross Creek. The water is blended in the WTP clearwell, where chlorine is applied for disinfection, and then pumped to the Minturn distribution system. Membrane System RFP: May 16, 2025 · Deadline for Questions (1 PM): May 30, 2025 Notice of Award to Supplier: July 3, 2025 · Detailed Shop Drawings Due: August 22, 2025 · Anticipated Solicitation for General Contractor: Q1 of 2026 · Anticipated Membrane Equipment Purchase by GC: Q2 of 2026 Minturn will issue a contract to a General Contractor (GC) for assembly and startup related services for the MF/UF system. While the contract will establish the GC's days for installation and to achieve construction milestones, and general performance requirements\ and timelines for completing the work, Minturn will not be directly responsible for the GC's schedule or work sequences. It is anticipated that the Contractor will be given approximately 12 weeks to install the equipment and ancillary piping and systems, from the time of equipment delivery to the start of functional testing. Minturn reserves the right to amend the schedule A new WTP is being constructed to replace the existing WTP and will include membranes as the primary treatment element. Minturn will work in conjunction with HDR to prepare and issue written addenda as appropriate. Suppliers shall only consider the information in this Request for Proposal and written addendum in developing their quote/proposal Minturn reserves the right to amend the schedule. the Town of Minturn, (Minturn) and HDR Engineering, Inc (HDR or Engineer) will select a MF/UF System Manufacturer (Supplier) to provide detailed submittal drawings and potentially equipment for the project. It is anticipated that the project will be issued for bid to General Contractors in the first quarter of 2026, and that equipment startup would occur in the first quarter of 2027, followed by performance testing. Questions, clarifications concerning the content of this proposal shall be submitted in writing only to: Jarod Limke HDR Engineering, Inc 1670 Broadway Denver, CO 80202. jarod.limke@hdrinc.com

Post-Bid

Water / Sewer

Public - City

Service, Maintenance and Supply

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
37
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 20, 2025

July 21, 2025

Project location map

To Be Determined, Minturn, CO

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.