Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published July 16, 2024 at 8:00 PM
Updated July 17, 2024
Site work for a civil project in Minturn, Colorado. Conceptual plans call for site work for a water / sewer project.
Reference Number 0000356624 Job Location: Vail, Colorado The Eagle River Water & Sanitation District (District) and the Upper Eagle Regional Water Authority (Authority) (D&A) require the professional services of a Design Professional to support the reconstruction of Bolts Lake Reservoir including the design of new embankment dams (Main Dam and Saddle Dam), reservoir liner, Cross Creek diversion, and Eagle River pump station. The D&A intends to deliver the construction of the Project via a Construction Manager At-Risk (CMAR) project delivery method. The Design Professional will interface with the Integrated Project Team consisting of the D&A management, the Program Manager, and the CMAR. The scope for the Facility Design includes a 30 percent design package with the opportunity for contract amendments incorporating the final detailed design and engineering support during construction. The facility shall be designed and constructed per industry standards to meet Colorado State Engineer's Office (SEO) dam safety rules and regulations. The primary tasks of the Facility Design scope include (1) Project Initiation and Scoping, (2) Design Drawing Development, (3) Specifications Outline, and (4) Evaluation of Diversion Alternatives. Question Deadline 08/01/2024 at 5:00 PM MT All questions regarding the RFP should be sent as an e-mail to: JHildreth@erwsd.org. Question shall be submitted as soon as possible, but no later than date and time. Buyer Preferences, Guidelines & Requirements General Requirements - Insurance Required The D&A reserves the right to revise the RFP prior to the date that Proposals are due. Notifications of all revisions to the RFP shall be emailed to all potential Proposers. The D&A reserves the right to extend the date by which the Proposals are due.
Conceptual
Water / Sewer
$600,000.00
Public - County
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 4, 2025
Eagle River St, Minturn, CO
Related To This Project
Minturn, CO
Bid Date: Aug 23 2024
Minturn, CO
Bid Date: Nov 22 2024
Minturn, CO
Bid Date: Jun 16 2025
Minturn, CO
Bid Date: Mar 28 2025
Minturn, CO
Bid Date: May 12 2025
Minturn, CO
Bid Date: Jun 20 2025
Minturn, CO
Bid Date: Jun 20 2025
Minturn, CO
Bid Date: Feb 09 2026
Minturn, CO
--
Minturn, CO
--
Minturn, CO
Bid Date: May 27 2022
Minturn, CO
Bid Date: Mar 25 2022
Minturn, CO
Bid Date: Feb 17 2022
Minturn, CO
--
Pueblo, CO
--
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
