BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published August 5, 2026 at 8:00 PM

Updated August 11, 2026

Site work and new construction of a mixed-use development in South Burlington, Vermont. Design plans call for the construction of a 43,303-square-foot transportation facility.

City of Burlington, Patrick Leahy Burlington International Airport for the second phase of an approved master plan for an airport complex. The project consists of constructing a 43,303 sq ft metal building for storage of snow removal equipment, a 3,658 sq ft shed for material storage, a fueling area, and a large, paved apron for vehicle maneuvering, 698 Airport Parkway. TIMELINE: As of, August 5th, 2026, the project is under site plan review with the Development Review Board. Information regarding a design team and general contractor have not been disclosed. A firm construction schedule has not been established. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Design

Transportation Terminals

$5,800,000.00

Public - City

New Construction, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
356
Active Projects
185
Bidding Soon
2,357
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 1, 2027

Project location map

698 Airport Pkwy, South Burlington, VT

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.