BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 21, 2025 at 8:00 PM

Updated July 22, 2025

Site work for a mixed-use development in Hazard, Kentucky. Completed plans call for site work for a municipal facility; sidewalk / parking lot; and water / sewer project.

The home of Jerald Hacker has been impacted by prelaw coal refuse-coal overburden debris. This debris clogged the east side drain beside the home, and, in part damaged the deck behind the home Abatement efforts will include removing the debris from the east side drain; then a reinforced concrete ditch is proposed to provide a long-term stable drain. This will provide for stability for the Hacker residence and the residence on the east side. Similarly, the back of the home (north side), will have debris removed. This will include removing the deck and constructing a concrete barrier wall for long-term stability of the home. The deck will be replaced in kind.

Award

Water / Sewer

$361,233.00

Public - State/Provincial

Site Work

5

5

7

5

Subscribe For Documents

26 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
127
Active Projects
85
Bidding Soon
815
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 1, 2025

August 1, 2025

Project location map

101 Bulldog Ln, Hazard, KY

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.