Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published August 22, 2025 at 8:00 PM
Updated August 23, 2025
Site work and new construction of a warehouse / distribution facility in Woodbridge Township, New Jersey. Completed plans call for the construction of a warehouse / distribution facility; and for site work for a warehouse / distribution facility.
Two ClearSpan structures, site improvement and two concrete bin blocks at Milepost 80.7 in Milltown, New Jersey. The Work consists of the following: 1. NJTA will be operating out of this location during the construction process. Temporary measures are required to keep the construction area separate from the Owner occupied areas. a. PROJECT SCOPE INCLUDES, BUT IS NOT LIMITED TO, THE FOLLOWING: 1) Site preparation 2) New pavement and pavement reconstruction 3) Excavation for foundations 4) Cast-In-Place footings and foundations 5) Installation of pre-engineered fabric shed buildings 6) Installation of HC Shipping Containers 7) Concrete Bin Boxes 8) Site electrical work (lights and receptacles) 9) Refer to contract documents for further information and descriptions. The Contractor agrees to make a good faith effort to award at least 25% of this Contract to Subcontractors registered by the Division as an SBE firm. Subcontracting goals do not apply if the prime Contractor is a registered SBE firm. The Contractor agrees to make a good faith effort to award at least 3% of this Contract to Subcontractors registered by the Division as a DVOB firm. Subcontracting goals do not apply if the prime Contractor is a registered DVOB firm. Prospective Bidders may register via e-mail to Richard Reuter by June 3, 2025 at reuter@njta.com Start date- September 1, 2025 Completion- September 16, 2026
Bid Results
Warehouse / Distribution
$2,584,745.00
Public - State/Provincial
New Construction, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 25, 2025
September 8, 2025
To Be Determined, Woodbridge Township, NJ
Related To This Project
Woodbridge Township, NJ
Bid Date: Jul 16 2025
Woodbridge Township, NJ
Bid Date: Jun 12 2025
Woodbridge Township, NJ
Bid Date: Jul 01 2025
Woodbridge Township, NJ
Bid Date: Jul 11 2025
Woodbridge Township, NJ
Bid Date: Aug 21 2025
Woodbridge Township, NJ
--
Woodbridge Township, NJ
Bid Date: Jul 15 2025
Woodbridge Township, NJ
Bid Date: Jul 28 2025
Woodbridge Township, NJ
Bid Date: Jun 27 2025
Woodbridge Township, NJ
Bid Date: Jul 01 2025
Woodbridge Township, NJ
Bid Date: Jun 09 2025
Woodbridge Township, NJ
Bid Date: Jun 05 2025
Woodbridge Township, NJ
--
Woodbridge Township, NJ
Bid Date: May 07 2025
Woodbridge Township, NJ
Bid Date: May 07 2025
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
