BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 7, 2025 at 8:00 PM

Updated August 8, 2025

Site work and new construction of a pre-engineered storage facility in Peyton, Colorado. Completed plans call for the construction of a 2,520-square-foot pre-engineered storage facility; and for site work for a pre-engineered storage facility.

As of August 7, 2025, project was awarded to Remington Builders Group, awarded amount is $348,591.36. Reference Number 0000388551 Build Equipment storage The project generally consists of the construction of a 2,520 square foot storage facility, including concrete foundation and floor slab, erection of a pre-engineered steel building, electrical, mechanical, and related work as described in the plans and specifications. Bid Intent Optional Bid Intent Deadline 07/03/2025 02:00 AM EDT Bonding Requirements - Bid Bond 5 % Bids shall be made on the forms furnished by the Owner and submitted via Bidnet Direct and endorsed with the name of the Bidder. A Bid Bond in an amount equal to five percent (5%) of the total Bid amount will be required. The Bid Bond will be retained by Owner as liquidated damages should the Successful Bidder fail to enter into a Contract with the Owner in accordance with the Bid. Bidders must supply a list of Subcontractors providing Ten Thousand Dollars ($10,000) or more in labor and/or materials to the Project. Attention is called to the fact the Bidders offer to assume the obligations and liabilities imposed by the Contract Documents. The Successful Bidder for the Project will be required to furnish a Performance Bond and a Labor and Materials Payment Bond in the full amount of the Contract Price, in conformity with the requirements of the Contract Documents. Bidders are hereby advised that the Owner reserves the right to not award a Contract until sixty (60) days from the date of the opening of Bids, and Bidders expressly agree to keep their Bids open for the sixty (60) daytime period. Question Deadline 06/26/2025 at 2:00 PM MT Questions are submitted online Yes, Any questions concerning this bid shall be submitted via online. Responses to questions regarding the Project are only binding if answered via Addendum. Owner reserves the right to reject any and all Bids, to waive any informality, technicality or irregularity in any Bid, to disregard all non-conforming, non- responsive, conditional or alternate Bids, to negotiate contract terms with the Successful Bidder, to require statements or evidence of Bidders' qualifications, including financial statements, and to accept the proposal that is, in the opinion of the Owner, in its best interest. The owner also reserves the right to extend the Bidding period by Addendum if it appears in its interest to do so.

Award

Warehouse / Distribution - Pre-Engineered Storage Building

$348,591.00

Public - City

New Construction, Site Work

20

5

2

4

Subscribe For Documents

43 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
139
Active Projects
53
Bidding Soon
1,004
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 10, 2025

September 8, 2025

Project location map

10028 Jaggar Way, Peyton, CO

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.