BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 10, 2025 at 8:00 PM

Updated July 11, 2025

Site work and paving for a road / highway in Reminderville, Ohio. Working plans call for site work for a road / highway; and for paving for a road / highway.

As of July 10, 2025 per owner: The lowest bidder is more than 20% over the Engineer’s Estimate, therefore, in accordance with Section 103.02 on page 76 of the bid documents, the project is not awardable. The work must be re-bid, or the improvements be delayed and included in a future project. 2025 Pavement Maintenance Asphalt. Should you have any questions, please let me know. (216.865.1345 / Chad.lewis@ohm-advisors.com) Each bid must contain the full names of the party or parties making the same, with an affidavit as to interested parties, and in the case of a corporation not chartered in Ohio, with a proper certificate that such corporation is authorized to do business in Ohio, and shall be accompanied by a Bid Guaranty Bond for the full amount (100%) of the Bid, in favor of the "Owner" or a certified check, cashier's check, or letter of credit pursuant to Chapter 1305 of the Ohio Revised Code, in the amount of 10% of the Bid, payable to the "Owner". The Scope of Work for the 2025 Pavement Maintenance Asphalt Project consists of the following: o Base Bid: Asphalt partial depth and full depth pavement repairs; and crack sealing o Areas will be marked by the Engineer along the entire limits of Clipper Cove, Surfside Circle, Pebble Beach Cove, Pirates Trail, Firethorn Drive, Redbud Drive, Holly Lane, Jasmine Lane, Colmanara Drive, Flagstone Drive, Jude Circle, Shadow Ledge Drive, Shady Timber Drive, Shale Drive, Tolland Drive, Fenmore/Penny Lane intersection area, Kerwick Court from Willowbrook Drive to South Limit, and Maryland Street and Florida Street from Glenwood Boulverd to North Limit. o Bid Alternate #1: Remove and replace all pavement markings at the Glenwood Boulevard/Liberty Road Traffic Circle and Eastward to the City Limit. o Follow the OMUTCD for maintenance of traffic, signage, safety, etc the Engineer's Official Estimate of Probable Cost for the Base Bid is $161,334.00. o The Engineer's Official Estimate of Probable Cost for Bid Alternate #1 is $15,000.00 The "Owner" reserves the right to reject any and all bids, to waive any informalities in the bids received, and to accept any bid which it deems most favorable.

Final Planning

Roads / Highways

$161,334.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
391
Active Projects
203
Bidding Soon
2,024
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 26, 2025

August 4, 2025

Project location map

Multiple Locations, Reminderville, OH

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.