Published August 1, 2025 at 8:00 PM

Updated August 2, 2025

Site work and paving for a mixed-use development in Fuquay Varina, North Carolina. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

Alston Ridge Greenway Project. The project includes the construction of approximately 2,400 linear feet of 10-foot-wide greenway trail consisting of asphalt path and boardwalk sections. The trail will connect the existing Basil Creek Trail on the east side of NC-55 within the Alston Ridge Subdivision to the existing greenway segment of the Bass Lake Trail in Holly Springs to the north. Work includes grading, drainage, boardwalk construction, paving, signage, and pavement markings. CONTRACT TIME AND LIQUIDATED DAMAGES: (4-17-12)(Rev. 5-16-23) 108 SP1 G08 C Except where otherwise provided by the contract, observation periods required by the contract will not be a part of the work to be completed by the completion date and/or intermediate contract times stated in the contract. The acceptable completion of the observation periods that extend beyond the final completion date shall be a part of the work covered by the performance and payment bonds. The liquidated damages for this contract are Two Hundred Dollars ($200.00) per calendar day. These liquidated damages will not be cumulative with any liquidated damages which may become chargeable under Intermediate Contract Time Number 1. INTERMEDIATE CONTRACT TIME NUMBER 1 AND LIQUIDATED DAMAGES: (7-1-95) (Rev. 2-21-12) 108 SP1 G13 A Except for that work required under the Project Special Provisions entitled Planting, Reforestation and/or Permanent Vegetation Establishment, included elsewhere in this proposal, the Contractor will be required to complete all work included in this contract and shall place and maintain traffic on same. The liquidated damages for this intermediate contract time are One Thousand One Hundred Dollars ($1,100.00) per calendar day.

Award

Roads / Highways

$1,557,963.00

Public - City

Paving, Site Work

47

8

2

2

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
238
Active Projects
149
Bidding Soon
1,757
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 24, 2025

September 1, 2025

Project location map

Multiple Locations, Fuquay Varina, NC

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.