BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 6, 2025 at 7:00 PM

Updated November 14, 2025

Site work for a water / sewer project in Wilmington, North Carolina. Completed plans call for site work for a water / sewer project.

Cape Fear Public Utility Authority (CFPUA) intends to procure a qualified Design-Builder (DB) to provide design and construction services for the study, elimination process and elimination work of irradicating bio-growth in the Pee Dee Raw Water Line. Questions pertaining to the selection process should be directed to Procurement Manager at bids@cfpua.org CFPUA shall not be held responsible for any oral instructions. Any changes to this Request for Qualifications (RFQ) will be in the form of an addendum, which will be furnished to all registered RFQ holders. Please register by email at bids@cfpua.org and provide company name and contact information. CFPUA reserves the right to reject any SOQs to waive any informality or irregularity in any SOQ received, and to be the sole judge of the merits of the respective SOQ received. Project Description: The Richardson Water Treatment Plant produces an average of 3 million gallons per day. In 2022 bio-growth was observed in the cartridge filters before the reverse osmosis membranes. After the operations staff investigated, the source appeared to be the Pee Dee aquifer. Environmental testing revealed it originated from surficial water sources. The raw water line was partially pigged in 2023, and a selection of wells were cleaned/ chlorinated in 2023. Bio growth has been reduced but continues to foul the cartridge filters. The goal of the project will be to determine the root cause of the bio-growth, develop options for eradication, remove bio growth from Pee Dee raw water line and develop a maintenance plan and schedule to prevent or reduce bio growth in the future. Total Estimated Design-Build Project Budget: $5,000,000 The project's anticipated schedule is to be substantially completed in April 2026 Questions pertaining to the selection process should be directed to Procurement Manager at bids@cfpua.org no later than 2:00 PM on June 24, 2025.

Award

Water / Sewer

$199,711.00

Public - City

Site Work

3

4

4

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
91
Active Projects
48
Bidding Soon
605
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 24, 2025

March 24, 2026

Project location map

633 Groundwater Way, Wilmington, NC

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.