BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 22, 2025 at 8:00 PM

Updated July 23, 2025

Site work for a mixed-use development in Guyton, Georgia. Completed plans call for site work for a playground / park / athletic field.

Phase I of the Atlas Park Remediation Project will focus exclusively on the removal of impacted sediment from designated areas within the on-site pond. Approximately 1,126 cubic yards of sediment--containing elevated concentrations of arsenic, barium, and lead will be dredged from two defined zones totaling approximately 0.70 acres. The scope of work includes installing environmental controls such as a skirted containment boom, performing dredging operations, and placing the dredged material in an on-site sediment placement area for dewatering. Effingham County will coordinate the subsequent transport and disposal of the dewatered sediment at a permitted Subtitle D landfill under a separate process. Question Deadline 06/23/2025 at 2:00 PM ET Any questions that arise after the pre-proposal conference must be made in writing via the Countys eProcurement Portal. Contact Information Danielle Carver Procurement and Captial Projects Manager 804 S Laurel St Springfield, GA 31329 Email: dcarver@effinghamcounty.org Phone: (912) 754-2159. Question Response Deadline:June 30, 2025, 4:00pm The Contractor will be responsible for selecting the appropriate dredging technique and placement of the dredge spoils in the sediment placement area which may include a suction dredging method and a pump and hose method to transport the sediment to the Sediment Placement Area. In order to prevent the migration of suspended sediments outside of the sediment removal areas, Contractor shall provide and install a containment boom with a floating surface device, skirt, and longitudinal support prior to dredging activities. The containment boom will be located immediately outside the limits of each sediment removal zone and will be anchored to the shoreline. The skirt will extend to the bottom of the pond. The containment boom will remain in place during all dredging activities and be routinely inspected by the Contractor to ensure it is functioning properly. Background Effingham County owns a property located at 216 Shady Oaks Road near Guyton, Georgia, and a pond is present on the Property. The Property has been entered into the Georgia Department of Environmental Protection (EPD) Voluntary Remediation Program (VRP). Sediments in specific areas of the pond have been sampled and are known to contain concentrations of arsenic, barium, and lead above the EPA Refinement Screening Values (RSVs). The removal of these sediments from the pond is planned as part of the overall remedial action proposed for the Property under the VRP.

Award

Playgrounds / Parks / Athletic Fields

$150,090.00

Public - County

Site Work

8

13

4

7

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
109
Active Projects
62
Bidding Soon
634
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 9, 2025

August 8, 2025

Project location map

216 Shady Oaks Rd, Guyton, GA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.