BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 16, 2025 at 8:00 PM

Updated July 17, 2025

Demolition, site work, paving and new construction of a bridge / tunnel in Rochester, Michigan. Completed plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

Bridge reconstruction including replacement with a 70-foot x 14-foot prefabricated pedestrian bridge on Paint Creek Trail over Paint Creek in the city of Rochester, Oakland County. This is a Local Agency project. Question Deadline 07/04/2025 All inquiries concerning the plans and proposal for this project are to be directed to: Sam Jabloniwski Enhancement Engineer MDOT-eProposal@Michigan.gov To be able to process and distribute an addendum, if required, all inquiries shall be made at least seven (7) calendar days before the letting. 3% DBE PARTICIPATION REQUIRED Net classification required for this project is 983 Fa Completion Date: 5/29/2026 Control Sec Job No Federal No TAU 63000 219364A 25A0630 MIDOT: 2507 004 - Bridge Reconstruction Including Replacement With a Prefabricated Pedestrian Bridge on Paint Creek Trail

Award

Bridges / Tunnels

$1,018,520.00

Public - State/Provincial

Demolition, New Construction, Paving, Site Work

13

10

5

8

Subscribe For Documents

20 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
327
Active Projects
179
Bidding Soon
2,352
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 11, 2025

August 11, 2025

Project location map

Paint Creek Trail, Rochester, MI

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.