BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 6, 2025 at 8:00 PM

Updated June 7, 2025

Demolition, site work and new construction of a bridge / tunnel in Bend, Oregon. Working plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; and for site work for a bridge / tunnel.

This project involves: This work is taking place on the Deschutes National Forest. The work entails the demolition of two existing Multi-Log Stringer Bridges measuring 36 feet and 25 feet in length. The scope includes furnishing, fabricating, and treating structural timber, along with all required yard lumber to complete the bridge system, followed by delivery and installation at the existing site. The contractor shall provide all necessary anchoring and fastening hardware, structural steel, bearing shoes/pads, stringers, sills, timber curbs, timber railings on both sides, backwall systems, blocking, running planks, and geocell foundation systems for the construction of two new trail bridges a 41-foot Glulam Stringer Trail Bridge and a 31-foot Longitudinal Glulam Deck Panel Trail Bridge. The East Cultus Lake Trail Bridge will be constructed using a newly fabricated Glulam Trail Bridge supplied by the contractor, while the Todd Meadow Nordic Trail Bridge will be built using a newly furnished Longitudinal Glulam Deck Panel Trail Bridge, also provided by the contractor. Construction at the East Cultus Lake Trail Bridge will include Overlapping Step Systems and borrow material will be placed for the approaches to the Todd Meadow Nordic Trail Bridge. The contractor is responsible for furnishing the sawn timber necessary for constructing Overlapping Step Systems. The magnitude of this construction project is between $100,000 and $250,000. THIS IS AN INFORMATIONAL NOTICE ONLY AND NOT A REQUEST FOR QUOTES. This notice is for the issuance of a blanket purchase agreement call request on the Trail Construction and Maintenance BPA 1240BJ21Q0015. THIS IS A REQUEST UNDER A PREVIOUSLY ISSUED BPA. WE ARE NOT LOOKING TO ADD NEW CONTRACTORS TO THE BPA AT THIS TIME. The Method of Contractor Selection has not been determined at this Time. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Final Planning

Bridges / Tunnels

$250,000.00

Public - Federal

Demolition, New Construction, Site Work

Our team is requesting plans for this project.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
17
Active Projects
6
Bidding Soon
116
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.