Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published June 6, 2025 at 8:00 PM
Updated June 7, 2025
Demolition, site work and new construction of a bridge / tunnel in Bend, Oregon. Working plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; and for site work for a bridge / tunnel.
This project involves: This work is taking place on the Deschutes National Forest. The work entails the demolition of two existing Multi-Log Stringer Bridges measuring 36 feet and 25 feet in length. The scope includes furnishing, fabricating, and treating structural timber, along with all required yard lumber to complete the bridge system, followed by delivery and installation at the existing site. The contractor shall provide all necessary anchoring and fastening hardware, structural steel, bearing shoes/pads, stringers, sills, timber curbs, timber railings on both sides, backwall systems, blocking, running planks, and geocell foundation systems for the construction of two new trail bridges a 41-foot Glulam Stringer Trail Bridge and a 31-foot Longitudinal Glulam Deck Panel Trail Bridge. The East Cultus Lake Trail Bridge will be constructed using a newly fabricated Glulam Trail Bridge supplied by the contractor, while the Todd Meadow Nordic Trail Bridge will be built using a newly furnished Longitudinal Glulam Deck Panel Trail Bridge, also provided by the contractor. Construction at the East Cultus Lake Trail Bridge will include Overlapping Step Systems and borrow material will be placed for the approaches to the Todd Meadow Nordic Trail Bridge. The contractor is responsible for furnishing the sawn timber necessary for constructing Overlapping Step Systems. The magnitude of this construction project is between $100,000 and $250,000. THIS IS AN INFORMATIONAL NOTICE ONLY AND NOT A REQUEST FOR QUOTES. This notice is for the issuance of a blanket purchase agreement call request on the Trail Construction and Maintenance BPA 1240BJ21Q0015. THIS IS A REQUEST UNDER A PREVIOUSLY ISSUED BPA. WE ARE NOT LOOKING TO ADD NEW CONTRACTORS TO THE BPA AT THIS TIME. The Method of Contractor Selection has not been determined at this Time. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Final Planning
Bridges / Tunnels
$250,000.00
Public - Federal
Demolition, New Construction, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 6, 2025
Multiple Locations, Bend, OR
Related To This Project
Bend, OR
Bid Date: Jul 01 2025
Bend, OR
Bid Date: Jul 15 2025
Bend, OR
Bid Date: Jul 07 2025
Bend, OR
Bid Date: Jul 24 2025
Bend, OR
Bid Date: Jun 18 2025
Bend, OR
Bid Date: Jul 02 2025
Bend, OR
Bid Date: Jun 11 2025
Bend, OR
Bid Date: Jun 03 2025
Bend, OR
Bid Date: Jun 18 2025
Bend, OR
Bid Date: May 29 2025
See the Projects and Companies Shaping 2026 Before Anyone Else
Start the New Year with a clearer view of the construction market. Unlock early access to commercial project data that keeps your pipeline full and your competitors behind. Sign up today for the project and contact data that others won't discover until its too late.
