BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 15, 2025 at 8:00 PM

Updated July 16, 2025

Renovation of a multi-residential development in Battle Ground, Washington. Working plans call for the renovation of a multi-residential development.

The VHA is seeking Design/Build Proposals for the replacement of its existing Fire Alarm Control Panel. The existing Edwards fire alarm system is no longer supported for replacement of components and is at "end of life". The purpose of this project is to enhance safety measures for staff and the public by replacing the existing non-addressable panel with a new code compliant addressable panel and new fire life safety devices as required by code. The project is being conducted in an occupied building which will require planning and consideration to minimize the amount of time the fire alarm is out of service. Questions/Clarifications Due Date: June 19, 2025 at 5:00 PM (PT) Current Design assumptions: The FAS design for R Use Occupancy per the current Washington State Building Code. Based on 10,859sf per floor, design assumes 2nd floor occupant load of less than 30 residents: Fire Sprinkler System Monitoring Confirm Code Implications /Applicable changes based on proposed SOW - Elevator Recall Confirm Code Implications /Applicable changes based on proposed SOW - Elevator Emergency Shutdown (Shunt Trip) Confirm Code Implications /Applicable changes based on proposed SOW - Notification throughout the building Confirm Code Implications / Applicable changes based on proposed SOW -Emergency backup lighting Confirm Code Implications / Applicable changes based on proposed SOW - HVAC detection and control if required Confirm Code Implications /Applicable changes based on proposed SOW -Power connections to new fire alarm devices, telecommunications equipment, WAPS, control panels and devices. Confirm Code Implications / Applicability based on proposed SOW - Any new systems shall pass all code applicable reviews including but not limited to: NEC,EIA/TIA, NFPA, State and local inspections and all standard acceptance criteria for testing /commissioning - Proposals to include owner training and orientation once installed. - Accessibility to test and maintain area detection vs. duct smoke detectors Vendor to conduct a fire alarm system test of all equipment following the completion of the replacement. Any deficiencies to be addressed immediately. Testing for area detectors only requires the application of aerosol (canned) smoke vs. the requirement to apply aerosol smoke. Shortlist Confirmed.

Final Planning

Multi-Residential

$1,310,000.00

Public - City

Renovation

7

5

4

2

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
148
Active Projects
78
Bidding Soon
873
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 3, 2025

September 1, 2025

Project location map

309 NE 1st Ave, Battle Ground, WA


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.