BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 9, 2025 at 8:00 PM

Updated July 10, 2025

Renovation of a residential development in West Milwaukee, Wisconsin. Completed plans call for the renovation of a residential development.

Furnish labor, material and service necessary to remove/replace the roof and garage at 6221 W. Lincoln Creek Drive Milwaukee, WI 53218 Note: Contractors shall perform work in accordance with all lead and asbestos removal procedures including, but not limited to, the containment and removal of materials on the ground. Contractor shall provide a dumpster for the containment of debris at commencement of project. Bagging is not acceptable. Contractor will be responsible for any damages done to lawn, or to neighbor's property. Site must be cleaned up DAILY Work shall commence within 10 business days of contract award and completed within 2 weeks of start date (weather permitting). Management Office must be notified, so tenants can be notified. Twenty-five percent (25%) or more overall EBE subcontract participation ROOF 1. Safeguard property from falling objects coming from the roof. 2. Remove existing shingles, drip edge, and any damaged or rotted roof sheathing and/or deck board on garage. 3. Contractor to replace any rotted roof sheathing, and properly prepare surface for roofing material. Contractor also to address/repair fascia at NW corner behind gutter prior to re-roofing. 4. Dispose of any cable lines, antenna and satellite dishes, etc, as applicable. 5. Install new drip edge on eaves. 6. Install engineered roof barrier/membrane. TIGER PAW or equivalent compatible with chosen roofing system. 7. Install starter strips at base of roof and roof eaves. Use manufacturer supplied cap shingles of matching color to dimensional shingles for ridge caps. Any exposed nail heads to be covered with roof caulk or tar. 9. Install 30-year dimensional shingles TIGER PAW, or approved equivalent. PROJECT MANAGER MUST APPROVE THE COLOR BEFORE INSTALLATION. Contractor shall use a minimum of 4 nails per shingle; nails to be sufficient in length to secure shingle, and install at a 90 degree angle to surface. Installation to follow manufacturer guidelines. Color to match house roof. 10.Provide minimum 30-year manufacturer’s warranty and 1-year on installed.

Bid Results

Residential Subdivision

$11,600.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
367
Active Projects
104
Bidding Soon
2,297
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 13, 2025

July 14, 2025

Project location map

2729 W Lapham St, West Milwaukee, WI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.