Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published July 1, 2025 at 8:00 PM
Updated July 2, 2025
Site work for a swimming pool in Sacramento, California. Working plans call for site work for a swimming pool.
Follwong are the shortlisted firms: CORE Construction w/Studio W Architects Flint Design Build w/DLR Group Otto Construction w/Lionakis June 20th, 2025, 12:00pm - Deadline to submit RFQ questions via email The Project consists of the following: The new pool facility shall include but not be limited to the following: 40 meter x 25-yard CIF competition pool minimum with capacity for minimum of 8 lanes of swimming, 1 water polo court, (2) 1 meter diving boards, and area for physical education instruction. Pool shall include starting blocks, accessible entry, separate stair entry, and recessed gutters. Spectator area/seating and deck space to accommodate bleachers and circulation space. Shade structure with solar panels for potential hot water generation and/or electrical PV's. Changing facilities, restrooms, outdoor showers, Coach's office/administration, flex space for team meetings including wet classroom use with tech access, equipment storage, including storage for pool covers with secure roller storage, dedicated ticketing and concessions, wireless timing (Colorado Time Systems), sound system and scoreboard, score board compatible with Colorado Time Systems and space to display school achievements/awards. The scope of work also includes pool equipment such as line lines, water polo goals and diving boards, new mechanical and filtration systems, with hydrostatic relief system and sight pump and necessary power and utilities to support the new pool and its systems. Site fencing and green space in pool enclosure space, lighting, and parking for staff, students, and spectators.
Final Planning
Swimming Pools
$22,000,000.00
Public - City
Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
28
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 26, 2025
February 23, 2026
3066 Freeport Blvd, Sacramento, CA
Related To This Project
Sacramento, CA
--
Sacramento, CA
--
Sacramento, CA
Bid Date: Sep 17 2025
Sacramento, CA
Bid Date: Jun 17 2025
Sacramento, CA
Bid Date: Aug 18 2025
Sacramento, CA
Bid Date: Jul 23 2025
Sacramento, CA
Bid Date: Jun 24 2025
Sacramento, CA
Bid Date: Jul 03 2025
Sacramento, CA
Bid Date: Jun 13 2025
Sacramento, CA
Bid Date: Jun 19 2025
Sacramento, CA
Bid Date: Jul 02 2025
Sacramento, CA
--
Sacramento, CA
Bid Date: Jun 12 2025
Sacramento, CA
Bid Date: Jun 17 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
