Published September 25, 2025 at 8:00 PM
Updated September 26, 2025
Demolition, site work and renovation of a detention facility in Lino Lakes, Minnesota. Completed plans call for the demolition of a detention facility; for site work for a detention facility; and for the renovation of a detention facility.
State Project Number 78LL0061 Cooling Replacement at Lino Lakes Minnesota Correctional Facility Scope of Work: The project scope involves replacing mechanical and electrical systems, including the rooftop unit at the segregation building and the air-cooled chiller system serving the Triad building. The Air-cooled chiller scope includes associated pumps, piping, accessories, and control valves. Minor structural work will also be performed at the Triad building. At the segregation building, the existing rooftop unit will be replaced with a similar variable air volume system featuring a DX cooling coil and a steam heating coil, without energy recovery. The new unit will be a standalone system with BACnet capability to allow for future integration into a building automation system. For the Triad building, the work includes a like-for-like replacement of the air-cooled chiller and secondary pumps, along with new piping, piping components, a chilled water buffer tank, and the upgrade of five existing pneumatic 3-way control valves to 2-way DDC control valves on the air handling units. The chiller replacement will also include new primary and secondary pumps, an air separator, expansion tank, buffer tank, chilled water piping, and DDC control valves for the air handling units located in the building's penthouse. Structural modifications will consist of a new outdoor concrete slab and the installation of a razor wire fence to enclose the chilled water buffer tank. Contractors are required to supply temporary rooftop units for the segregation building and a temporary chiller for the Triad building to maintain operations during construction. A. The work will be done under one prime contract that includes: general, demolition, mechanical, and electrical construction. Question Deadline 06/27/2025 at 1:00 PM CT All questions should be submitted no later than Tuesday, The State is not obligated to answer questions submitted after the question due date and time. B. The following summary is a general guide to the scope of work. It should not be construed as a detailed list of work included in the contract. This project has a 3% Targeted Group (TG), Economically Disadvantaged (ED), and Veteran-Owned (VO) Small Business (TG/ED/VO) subcontracting goals established. 1. Mechanical and electrical demolition and construction to replace rooftop chiller and pumps for Triad Building.. 2. Installation of new AHU for Segregation Building. This Project has a 3% Targeted Group, Economically Disadvantaged, Veteran-Owned Small Businesses (TG/ED/VO) subcontracting goal. End Date: 12/30/2025 All questions should be submitted no later than Monday, July 7, 2025 at 1:00 pm CT. The State is not obligated to answer questions submitted after the question due date and time.
Award
Jails / Prisons
$1,533,674.00
Public - State/Provincial
Demolition, Renovation, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
9
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.