BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 1, 2025 at 8:00 PM

Updated July 2, 2025

Renovation of a water / sewer project in Port Huron, Michigan. Completed plans call for the renovation of a water / sewer project.

The four (4) lake huron water treatment plant (LHWTP) vertical turbine rapid mixers are to be replaced with enw mixers, provided by GLWA. The two rapid mix basins in the south will follow as shutdown capacity permits in the low demand period starting October 2026. All pre-work associated with structural improvements to support the new, heavier mixers, electrical upgrade pre-work, etc., may be performed if it doesn't not require the shutdown of existing equipment. The mixers can only be taken out of service two at a time, and only during low-demand period of GLWA's operation, typically between October of one year and April of the next. The new mixers will be variable frequency drive (VFD). The new VFDs will be installed on the second-floor hot deck. In 10/26, four LHWTP vertical turbine rapid mixers will be replaced with GLWA-provided VFD mixers. Work on two south basins begins Oct 2026 during low-demand periods. Pre-work for structural and electrical upgrades may proceed without shutdowns. VFDs will be installed on the second-floor hot deck.

Post-Bid

Water / Sewer

$6,000,000.00

Public - State/Provincial

Renovation

Our team is requesting plans for this project.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
249
Active Projects
103
Bidding Soon
2,132
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 23, 2025

July 23, 2025

Project location map

1200 Pine Grove Ave, Port Huron, MI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.