BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 19, 2025 at 8:00 PM

Updated August 20, 2025

Site work for a water / sewer project in Palmdale, California. Completed plans call for site work for a water / sewer project.

The work may consist of but is not limited to: will provide for restoration services for the installation and maintenance of the Habitat Restoration/Mitigation Program (HRMP) and the Native Desert Preservation Plan (NDPP) of transplanted Joshua trees [Yucca brevifolia]) for the Upper Amargosa Creek Recharge Project, located between North of Elizabeth Lake Road, from 0.5 mile west of 25th Street West and to 0.3 mile east of 25th Street West in Palmdale, California. A total of 50 acres will be created, restored, or enhanced on site (the Mitigation Area; see Exhibit 2 in the HRMP [Attachment A]). The HRMP/NDPP were developed to fulfill a variety of mitigation measures and/or conditions required by the Final Environmental Impact Report - Amargosa Creek Improvement Project (City of Palmdale 1993), Supplemental Environmental Impact Report Upper Amargosa Creek Recharge Project (City of Palmdale 2018), and California Department of Fish and Wildlife (CDFW) Streambed Alteration Agreement (SAA) No. 1600-2014-0253-R5 (June 14, 2018). The HRMP/NDPP provide guidelines for preliminary mitigation tasks; initial Mitigation Area preparation and installation; long-term maintenance; biological monitoring; final program approval; and contingency measure implementation. The work may consist of, but is not limited to: o Mobilization activities, including preparation of project work schedule; securing all required o approvals; designation of staging areas and access locations; installation of staking, fencing, and signage. o Initial non-native plant species and trash removal (one site-wide event). o Preliminary weed abatement period (one year). o Site preparation work, including soil treatments (including decompaction/scarification); o design/installation of temporary irrigation system; installation of erosion control measures. o Native container plants and cuttings growth and installation (Procure and Install) o Apply Native Seed Mixes (Including Hydroseeding and Hand-broadcast Seeding) o Design and Install Temporary Irrigation System o Post-installation habitat maintenance (five years). o Project area clean up, including temporary irrigation system removal. o Demobilize. Online Q&A Yes Q&A Deadline 07/09/2025 2:00 PM (PDT) Bid Bond 10.00% Payment Bond 100.00% Performance Bond 100.00% Start/Delivery Date October 2025 (est.) Project Duration 240 Working Days Liquidated Damages $250/Calendar Day License Requirements C Project Type Bid Response Types Line Items Type of Award Lump Sum For additional detailed correspondence, please direct inquiries to Mike Shahbakhti at (661) 267-5100 or mshahbakhti@cityofpalmdaleca.gov The Project includes, without limitation, furnishing all necessary labor, materials, equipment, and other incidental and appurtenant Work necessary to satisfactorily complete the Project, as more specifically described in the Contract Documents. This Work will be performed in strict conformance with the Contract Documents, permits from regulatory agencies with jurisdiction, and applicable regulations. The quantity of Work to be performed and materials to be furnished are approximations only, being given as a basis for the comparison of Bids. Actual quantities of Work to be performed may vary at the discretion of the City Engineer and/or his designee. The work may consist of but is not limited to: will provide for restoration services for the installation and maintenance of the Habitat Restoration/Mitigation Program (HRMP) and the Native Desert Preservation Plan (NDPP) of transplanted Joshua trees [Yucca brevifolia]) for the Upper Amargosa Creek Recharge Project, located between North of Elizabeth Lake Road, from 0.5 mile west of 25th Street West and to 0.3 mile east of 25th Street West in Palmdale, California. (see Exhibit 2 in the HRMP [Attachment A]). The work is estimated to cost approximately $2,500,000.00 and shall be completed in 240 working days QA - 7/2/25: The project total duration for installation including weed abatement is 240 working days. The 5 year long term maintenance is post Installation and is paid under bid item 12. Bidders to estimate the frequency of maintenance for the 5 year maintenance period. Yes both hard copy and scan copy of Bid Bond shall l be submitted at the time of bid submission

Award

Water / Sewer

$2,217,281.00

Public - City

Site Work

10

22

5

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
513
Active Projects
264
Bidding Soon
3,761
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 15, 2025

October 1, 2025

Project location map

Elizabeth Lake Rd & 25th St W, Palmdale, CA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.