Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published August 29, 2025 at 8:00 PM
Updated August 30, 2025
Site work for a water / sewer project in Carlsbad, California. Completed plans call for site work for a water / sewer project.
The Encina Wastewater Authority (EWA or Owner) is requesting bids from qualified Coatings Contractors to provide coatings on non-buried pipes, tanks, buildings, appurtenances and equipment at the Encina Water Pollution Control Facility (EWPCF) located in Carlsbad, California, and may also include other remote facilities. Other Details EWA desires to engage a Contractor on an as-needed basis and issue individual Task Orders that describe the Work to be performed by the Contractor during the term of each Task Order. The individual Task Orders will cover the projects identified for fiscal years 2026 to 2028. The Contractor shall provide all labor, materials, equipment, tools, and safety measures to complete all required work within the time stipulated and in strict compliance with the Contract Documents and Task Order. Online Q&A Yes Q&A Deadline 06/26/2025 2:00 PM (PDT) The work covered under this request for bids generally includes furnishing all labor, materials, equipment, and services for the following Task Orders: Task Order 1 - Protective Coatings Rehabilitation for Centrifuge Feed Pump Pit: Rehabilitate the protective coatings on the pipes, pumps and valves within Centrifuge Feed Pump Pit. The Centrifuge Feed Pump Pit drawings prepared by Black & Veatch are included as part of Attachment 1 and provide dimensions of the items to be coated. The Contractor shall use a coating system included in the Coating Specification Section (also provided in Attachment 1). Biddershall note thatthe work under TaskOrder 1may not proceed asthe first chronological TaskOrder and isincluded explicitly in this RFB for Bid evaluation purposes. Work under Task Order 1 is anticipated to proceed at some point during the contract duration. Future Task Orders - As-Needed Plantwide Protective Coating Application Services: EWA anticipates the work to be performed under Future Task Orders to be similar to the coating rehabilitation work for other metallic above-grade pipes and appurtenances that is included in Task Order 1 work.
Award
Water / Sewer
$12,912.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 10, 2025
August 11, 2025
6200 Avenida Encinas, Carlsbad, CA
Related To This Project
Carlsbad, CA
Bid Date: Jul 01 2025
Carlsbad, CA
Bid Date: Jan 27 2026
Carlsbad, CA
Bid Date: Jul 15 2025
Carlsbad, CA
Bid Date: Jul 30 2025
Carlsbad, CA
--
Carlsbad, CA
Bid Date: Jan 27 2026
Carlsbad, CA
Bid Date: Aug 08 2025
Carlsbad, CA
Bid Date: Sep 04 2025
Carlsbad, CA
Bid Date: Jun 18 2025
Carlsbad, CA
Bid Date: Jun 24 2025
Carlsbad, CA
Bid Date: Jun 12 2025
Carlsbad, CA
Bid Date: Jun 25 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
