Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published July 30, 2025 at 8:00 PM
Updated July 31, 2025
Demolition, site work and asbestos abatement for a municipal facility in Huntington, Indiana. Completed plans call for the demolition of a 80,000-square-foot municipal facility; for site work for a municipal facility; and for asbestos abatement for a municipal facility.
Furnishing All Labor, Materials, and Performing All Work in Connection With:asbestos Demolitionformer Hk Porter Friction Materials Site1849 Sabine Street, Huntington, Indiana The project consists of the demolition of the existing building . The building contains asbestos-containing materials (ACMs), including regulated asbestos-containing material (RACM), in addition to asbestos laden dust associated with historical asbestos manufacturing operations. Question Deadline 06/30/2025 Questions regarding the scope of work for the project, general conditions, specifications, etc. must be submitted via electronic mail to the Owner Consultant . Submit questions to: Michael Yergin Project Consultant SME 11800 Exit 5 Parkway, Suite 106 Fishers, Indiana 46038 Email address: michael.yergin@sme-usa.com Unless further time is required for analysis of the bids or investigation of the responsibility of any bidder and in the absence of a limitation upon the time of acceptance set forth in the bid, the Contract(s) will be awarded by the Owner by July 21, 2025. The notice of the award will be transmitted via facsimile and mailed to the address given by the Bidder(s) on the proposal by July 22, 2025. A Notice To Proceed with contract work will be issued to the successful bidder upon award. Upon receipt of the Notice To Proceed, the selected bidder(s) will be responsible to notify the appropriate regulatory agencies via overnight delivery service such that the scope of work, including demobilization, is completed within 120 days of the Notice To Proceed. Bids submitted for the work shall be applicable and firm for 120 days following submission. Bids may not be withdrawn or altered prior to this date The proposed scope of work will involve demolition of the building without removal of the ACMs (asphalt roofing materials, cementitious wall and ceiling panels) or pre-demolition cleanup of asbestos-laden dust. The site consists of adjoining structures with multiple construction dates, totaling approximately 80,000 square feet. The project will require significant dust suppression techniques to eliminate any visible dust emissions during demolition activities as the safety of surrounding residents and residential properties is critical. Bids will be accepted on the Work indicated in Base Bids with unit costs for additional work which may be requested. Bid security shall be furnished in accordance with the Instructions to Bidders. Bidders shall submit proof of qualifications to perform the Work as described in the Instructions to Bidders.
Award
Municipal
$1,391,276.00
Public - City
Asbestos Abatement, Demolition, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 7, 2025
August 6, 2025
1849 Sabine St, Huntington, IN
Related To This Project
Huntington, IN
Bid Date: Jul 24 2025
Huntington, IN
Bid Date: Aug 18 2025
Huntington, IN
Bid Date: Sep 10 2025
Huntington, IN
Bid Date: Jul 13 2020
Huntington, IN
Bid Date: Sep 12 2025
Huntington, IN
Bid Date: Sep 12 2025
Huntington, IN
Bid Date: Sep 29 2025
Huntington, IN
Bid Date: Sep 17 2025
Huntington, IN
Bid Date: Jun 11 2025
Huntington, IN
Bid Date: May 20 2025
Huntington, IN
--
Huntington, IN
--
Huntington, IN
Bid Date: Apr 22 2025
Huntington, IN
Bid Date: May 02 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
