Demolition, site work and asbestos abatement for a municipal facility in Huntington, Indiana. Completed plans call for the demolition of a 80,000-square-foot municipal facility; for site work for a municipal facility; and for asbestos abatement for a municipal facility.

Furnishing All Labor, Materials, and Performing All Work in Connection With:asbestos Demolitionformer Hk Porter Friction Materials Site1849 Sabine Street, Huntington, Indiana The project consists of the demolition of the existing building . The building contains asbestos-containing materials (ACMs), including regulated asbestos-containing material (RACM), in addition to asbestos laden dust associated with historical asbestos manufacturing operations. Question Deadline 06/30/2025 Questions regarding the scope of work for the project, general conditions, specifications, etc. must be submitted via electronic mail to the Owner Consultant . Submit questions to: Michael Yergin Project Consultant SME 11800 Exit 5 Parkway, Suite 106 Fishers, Indiana 46038 Email address: michael.yergin@sme-usa.com Unless further time is required for analysis of the bids or investigation of the responsibility of any bidder and in the absence of a limitation upon the time of acceptance set forth in the bid, the Contract(s) will be awarded by the Owner by July 21, 2025. The notice of the award will be transmitted via facsimile and mailed to the address given by the Bidder(s) on the proposal by July 22, 2025. A Notice To Proceed with contract work will be issued to the successful bidder upon award. Upon receipt of the Notice To Proceed, the selected bidder(s) will be responsible to notify the appropriate regulatory agencies via overnight delivery service such that the scope of work, including demobilization, is completed within 120 days of the Notice To Proceed. Bids submitted for the work shall be applicable and firm for 120 days following submission. Bids may not be withdrawn or altered prior to this date The proposed scope of work will involve demolition of the building without removal of the ACMs (asphalt roofing materials, cementitious wall and ceiling panels) or pre-demolition cleanup of asbestos-laden dust. The site consists of adjoining structures with multiple construction dates, totaling approximately 80,000 square feet. The project will require significant dust suppression techniques to eliminate any visible dust emissions during demolition activities as the safety of surrounding residents and residential properties is critical. Bids will be accepted on the Work indicated in Base Bids with unit costs for additional work which may be requested. Bid security shall be furnished in accordance with the Instructions to Bidders. Bidders shall submit proof of qualifications to perform the Work as described in the Instructions to Bidders.

Award

Municipal

$1,391,276.00

Public - City

Asbestos Abatement, Demolition, Site Work

4

12

3

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
44
Active Projects
4
Bidding Soon
791
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 7, 2025

August 6, 2025

Project location map

1849 Sabine St, Huntington, IN


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.