BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 28, 2025 at 7:00 PM

Updated December 13, 2025

Site work and paving for a road / highway in Sioux City, Iowa. Conceptual plans call for site work for a road / highway; and for paving for a road / highway.

https://www.ktiv.com/2025/07/30/work-continues-sioux-city-bridge-over-floyd-river/ Work continues on Sioux City Bridge over the Floyd River Close By Brandon Martin Published: Jul. 17, 2025 at 3:12 AM GMT+5:30|Updated: Jul. 31, 2025 at 3:15 AM GMT+5:30 SIOUX CITY (KTIV) - Work continues on a recently closed Sioux City bridge over the Floyd River in the Hoeven Valley area. The Sioux City Engineering Division says the 11th Street Bridge’s emergency repairs are completed, but pavement markings are still in the process of being remarked for the bridge to be reopened. “For the safety of the traveling public, the bridge will be reduced to only the outside lanes of traffic and weight posted for 22 tons for single-unit vehicles, 37 tons for single-trailer vehicles, and 37 tons for multi-trailer vehicles,” stated city officials in a press release. The bridge is expected to reopen to traffic the week of Aug. 4, weather permitting, after work is done with the new pavement markings. Drivers are to use the detour shown below while the work continues. Drivers are advised to use the posted detour route that utilizes Business 75 /... Drivers are advised to use the posted detour route that utilizes Business 75 / Lewis Boulevard, 6th Street, and Hoeven Drive, or find an alternative route. (Sioux City Engineering Division) The city’s Engineering Division closed the bridge back on July 16 and the emergency repairs began on Tuesday, July 22. Want to get the latest news and weather from Siouxland’s News Source? Follow these links to download our KTIV News app and our First Alert Weather app. ------------------------------------------------------- A detailed Scope has not yet been determined. As of June 14, 2025, this project is included in the City's 2025-2030 Capital Improvement Program (CIP) *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Conceptual

Roads / Highways

$3,100,000.00

Public - City

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
8
Active Projects
0
Bidding Soon
308
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 1, 2028

Project location map

11th St, Sioux City, IA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.