Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published August 27, 2025 at 8:00 PM
Updated August 28, 2025
Site work and new construction of a municipal facility in Moses Lake, Washington. Completed plans call for the construction of a 10,000-square-foot municipal facility; and for site work for a municipal facility.
The project involves the construction of a new, approximately 10,000-square-foot coroners office and morgue to serve Grant County. The space will include a two-bay autopsy suite, a full-body x-ray, a separate large-bore CT Scanner, a drive-through sallyport, freezers and coolers, staff space, a viewing room, and a family meeting room. Space will need to be designed and sited to allow for future flexibility. The project construction budget is approximately $4.5 million. We anticipate, with input from the selected General Contractor/Construction Manager (GC/CM), that construction will begin as soon as possible. Design phase activities include involvement of General Contractor/Construction Manager to: (1) assist in development of schedules, cost estimates, value analysis, quality and phasing the work effort well before construction can start and provide added assurance that the project will be completed on time, and (2) be involved heavily in the design stage of the project to provide services to address constructability, sub-bid contracting strategies, and cost savings alternatives. Questions, per RFQ, should be addressed to Andrea Rutledge, Turner & Townsend Heery via e-mail (Andrea. Rutledge). Grant County encourages the participation of Minority Owned and Women-Owned Business Enterprises in this Request for Proposal. Any questions or requests for clarification regarding this Request for Proposal during the submittal preparation period must be addressed to the County's designated representative: Andie Rutledge Project Coordinator Turner & Townsend Heery Email: Andrea.Rutledge@turntown.com CC: David.Beaudine@turntown.com CC: tgaines@grantcountywa.gov June 30, 2025 Last day for Questions from Proposers, 3:00 pm.
Post-Bid
Municipal
$4,500,000.00
Public - County
New Construction, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 10, 2025
June 1, 2026
1038 W Ivy Ave, Moses Lake, WA
Related To This Project
Moses Lake, WA
Bid Date: Jul 10 2025
Moses Lake, WA
--
Moses Lake, WA
--
Moses Lake, WA
--
Moses Lake, WA
--
Moses Lake, WA
--
Moses Lake, WA
Bid Date: Nov 18 2025
Moses Lake, WA
Bid Date: Jun 17 2025
Moses Lake, WA
--
Moses Lake, WA
--
Moses Lake, WA
--
Moses Lake, WA
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
