BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 13, 2025 at 8:00 PM

Updated January 16, 2026

Site work and paving for a road / highway in Mount Pleasant, South Carolina. Working plans call for site work for a road / highway; and for paving for a road / highway.

PSCDOT requests Statement of Qualifications from those interested to serve as the Design-Build Team for the design and construction services Long Point Road Interchange Improvement in Charleston County. End date: August 31, 2030 The project consists of all work necessary to complete the design and reconstruction of I-526 exit 28 at S-97 (Long Point Road). The Project includes design and construction of new ramp exit and entrance points to I-526 and a new connector road to access the State Ports Authority Wando Welch Terminal. Work includes reconstruction of the existing S-97 (Long Point Road) interchange, reconstruction a portion of S-97 (Long Point Road) to intersect the new connector road, interstate widening and overlay of existing mainline pavement, new bridges over I-526 and S- 97 (Long Point Road), ramps, retaining walls, noise barrier walls, sidewalks, shared use path, drainage facilities, and related roadway appurtenances. The project also includes right-of-way acquisition and coordination, design, and relocation of utilities

Final Planning

Roads / Highways

$400,000.00

Public - State/Provincial

Paving, Site Work

838

130

10

2

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
105
Active Projects
50
Bidding Soon
703
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 14, 2025

March 16, 2026

Project location map

Long Point Rd, Mount Pleasant, SC

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.