BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 22, 2025 at 8:00 PM

Updated July 23, 2025

Site work and paving for a mixed-use development in Zimmerman, Minnesota. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

This work consists of constructing cast-in-place concrete curbs, curb and gutter, medians, driveway pavement, pedestrian ramps, and other similar traffic delineation or service items as indicated on the drawings or as specified herein. Question Deadline 06/25/2025 Questions received less than seven days prior to the date for opening of Bids may not be answered. Contact information and submittal procedures for such questions are as follows 7533 Sunwood Drive NW, Suite 206, Ramsey, MN 55303, (763) 433-2851 250 LF Remove and Replace Concrete Curb & Gutter 2,800 TON Bituminous Wearing Course (2,B) 115 SY Bituminous Patch 550 SF 6" Concrete Walk 30,400 SY 1.5" Mill Bituminous Pavement 80 SF Truncated Domes

Award

Roads / Highways

$285,805.00

Public - City

Paving, Site Work

16

14

4

Subscribe For Documents

16 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
289
Active Projects
137
Bidding Soon
1,432
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 2, 2025

September 1, 2025

Project location map

Multiple Locations, Zimmerman, MN

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.