Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published July 29, 2025 at 8:00 PM
Updated July 30, 2025
Site work for a water / sewer project in Osceola, Arkansas. Completed plans call for site work for a water / sewer project.
General Contract to replace the existing split case high service pumps at the Osceola water treatment plant. A portion of the ductile iron pipes ,fittings, and gate valves will also be removed and replaced. Bids shall be on a unit price basis. Owner encourages all small, minority, and women business enterprises to submit bids for capital improvements .Encouragement is also made to all general contractors that in the event they subcontract portions of their work, consideration is given to the identified groups. Each Bid must be submitted on the prescribed form and accompanied by a certified check or bid bond executed on the prescribed form, payable to the City of Osceola, Arkansas in an amount not less than 5 percent of the amount bid. The bid proposal and work of the proposed contract shall be in accordance with all applicable federal, state, county, and local laws, ordinances and regulations. For information concerning the proposed Work, contact Will Perilloux or Max Hicks at the Engineer's office Any Bid may be rejected which contains material omissions, or irregularities, or in which any of the unit prices are obviously unbalanced in the opinion of the Owner. Also, a bid may be rejected if it, in any manner, shall fail to conform to the conditions of the Bidding Requirements and Contract Documents. The Owner reserves the right to waive irregularities, reject bids, choose the most qualified bidder for the Project, and to post pone award of the Contract for a period of time which shall not exceed beyond 90 days from the bid opening date Each Bid must be submitted on the prescribed form and accompanied by a certified check or bid bond executed on the prescribed form, payable to the City of Osceola, Arkansas in an amount not less than 5 percent of the amount bid. The bid proposal and work of the proposed contract shall be in accordance with all applicable federal, state, county, and local laws, ordinances and regulations. For information concerning the proposed Work, contact Will Perilloux or Max Hicks at the Engineer's office
Award
Water / Sewer
$277,500.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 2, 2025
August 1, 2025
100 E Semmes Ave, Osceola, AR
Related To This Project
Osceola, AR
--
Osceola, AR
Bid Date: Apr 08 2025
Osceola, AR
Bid Date: Mar 07 2025
Osceola, AR
Bid Date: Feb 24 2025
Osceola, AR
Bid Date: Sep 05 2024
Osceola, AR
Bid Date: Jul 11 2024
Osceola, AR
Bid Date: Jul 18 2024
Osceola, AR
--
Osceola, AR
Bid Date: Apr 18 2024
Osceola, AR
Bid Date: Apr 09 2024
Osceola, AR
Bid Date: Apr 09 2024
Osceola, AR
Bid Date: Apr 10 2024
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
