BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 15, 2025 at 8:00 PM

Updated July 16, 2025

Site work and paving for a bridge / tunnel in Glencoe, Illinois. Completed plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

The Sylvan Road Bridge deck is approximately 60 feet in length and the improvement consist of bridge deck resurfacing, associated maintenance work, and ancillary repairs to the existing structure. All work is in the existing right-of-way. Bid Bond 10% All Prospective Bidders/respondents Are Hereby Cautioned Not to Contact Any Member of the Village of Glencoe Staff or Officials Other Than the Specified Contact Person(S). Minority-owned, Woman-owned, and Small Business Enterprises Are Encouraged to Respond to This Solicitation. Bidders may submit questions to the Owner in writing, addressed to Village Engineer James Tigue at jtigue@villageofglencoe.org. Answers to questions will be provided in writing and will be shared with all other known plan holders. Questions must be submitted by June 30, 2025 at 5:00 pm. Answers will be provided on or before July 2, 2025. This improvement consists of bridge deck resurfacing, associated maintenance work, and ancillary repairs to the existing structure. All work is in the existing right-of-way. The work to be performed under the base bid of this Contract generally consists of the following work tasks: 1. Removal of the existing concrete bridge deck (and sidewalk) surface and replacement with a latexmodified concrete overlay. 2. Removal and replacement of the bituminous transition pavement surface on the east and west sides of the bridge. 3. Removal and replacement of the concrete approach sidewalks on the east and west sides of the bridge. 4. Isolated curb and gutter replacement. 5. Repair deteriorated concrete on the existing concrete structures. 6. Apply a concrete sealer to existing concrete structures including the main span bridge deck and railings. 7. Provide all incidental and collateral work necessary to complete the project as shown on the Contract Plans and described herein.

Award

Bridges / Tunnels

$195,000.00

Public - City

Paving, Site Work

32

8

5

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
510
Active Projects
284
Bidding Soon
3,666
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 8, 2025

August 1, 2025

Project location map

Sylvan Rd, Glencoe, IL


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.