Published August 26, 2025 at 8:00 PM

Updated August 29, 2025

Renovation of a warehouse / distribution facility in Riverside, California. Completed plans call for the renovation of a warehouse / distribution facility.

CUPCCAA MOT Fuel Island Equipment Upgrade REBID SCOPE OF WORK Obtain required permits, remove 2 existing antiquated vacuum assist fuel pumps (1 unleaded w/2 nozzles, 1 diesel w/1 nozzle) with 2 new balance pumps (with nozzles; 2 unleaded and 1 diesel) Remove Maga Track fuel nozzle activation dispensing controls with GIR W150 Control Panel and required cloud based software (SaaS) or equivalent (capable of interconnection with EVO T550 fuel level alarm monitor) Saw cut, trench and run necessary cabling, perform soil testing and perform all necessary inspection. The Contractor shall furnish all labor, materials, equipment, tools, and utility and transportation services, and perform and complete all work required in connection with \ in strict accordance with the Contract Documents enumerated in Article 7 below. The Contractor shall be liable to the District for any damages arising as a result of a failure to comply with that obligation, and the Contractor shall not be excused with respect to any failure to so comply by an act or omission of the Architect, Engineer, Inspector, Division of the State Architect (DSA), or representative of any of them, unless such act or omission actually prevents the Contractor from fully complying with the Contract Documents and the Contractor protests, in accordance with the Contract Documents, that the act or omission is preventing the Contractor from fully complying with the Contract Documents. Such protest shall not be effective unless reduced to writing and filed with the District office within seven (7) days of the date of occurrence of such act or omission preventing the Contractor from fully complying with the Contract Documents. Question Deadline 08/20/2025 Request for Information Deadline Daryl Koroluck - dkoroluck@riversideunified.org Jane Jumnongsilp - cjumnongsilp@riversideunified.org Ashlee MasonCooper - amasoncooper@riversideunified.org Separate payment and performance bonds, each in an amount equal to 100% of the total Contract amount, are required, and shall be provided to the District prior to execution of the Contract and shall be in the form set forth in the Contract Documents. All bonds (Bid, Performance, and Payment) must be issued by a California admitted surety as defined in California Code of Civil Procedure section 995.120. Bid Security. Each bid must be accompanied by one of the following forms of bidder's security: (1) cash; (2) a cashier's check made payable to the District; (3) a certified check made payable to the District; or (4) a bidder's bond executed by a California admitted surety as defined in Code of Civil Procedure section 995.120, made payable to the District, in the form set forth in the Contract Documents. Such bidder's security must be in an amount not less than ten percent (10%) of the maximum amount ofsuch bidder's bid as a guarantee that the bidder will enter into the Contract, if the same is awarded to such bidder, and will provide the required Performance and Payment Bonds, insurance certificates and any other required documents. In the event that a bidder is awarded the Contract and such bidder fails to enter into said Contract or provide the surety bond or bonds within five (5) calendar days after award of the Contract to bidder, said security will be forfeited. The District reserves the right to reject any or all bids or to waive any irregularities or informalities in any bids or in the bidding.

Post-Bid

Warehouse / Distribution

$108,563.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
611
Active Projects
272
Bidding Soon
3,443
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 28, 2025

December 22, 2025

Project location map

3070 Washington St, Riverside, CA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.