Site work for a bridge / tunnel in Whistler, British Columbia. Completed plans call for site work for a bridge / tunnel.
The RMOW is inviting qualified teams to provide design-build proposals for two new clear span bridges to replace the existing recreation trail bridges located over North Sproat Ck. (A-Frame) and Gin and Tonic Creek (Suspension). These bridges are a key part of the Rainbow hiking Trail in Whistler BC, see location map in Section 9. Both existing bridges are at or near end of life and require removal and replacement with new long lasting and low maintenance, free span bridges. Proponents are encouraged to align their designs with the areas recreational use and natural site characteristics while ensuring the efficiency of construction is well understood and managed within the constraints of the topography and access. Question Deadline 07/10/2025 at 4:00 PM PT Scope of Work (SOW) 1. General a) This project has a maximum desired value of up too $200,000 for all works including the design-build scope of this RFP. The successful proponent may be considered to provide a third bridge of similar size and scope in 2026/27 if budget allows. Proponents are to be mindful that cost scoring represents the largest evaluation component; b) Proponents must understand all reports and assessments provided in this RFP; c) A 50% performance bond will be required to the successful proponent. a) Both bridges to be clear span, clear deck width of 1.2m, railings shall be min 1.5m in height with three mid rails spaced evenly; _ Gin and Tonic (Bridge 1) length estimated at 13m, 997 m. elevation. Existing cable suspension anchors may be viable for reuse if desired _ North Sproat Creek (Bridge 2), length estimated at 16m, 898m elevation b) Bridge approaches must have vegetation, recycled timber or other extension that flares away from the bridge ends to protect and funnel users on to the bridge. Stairs or a ramp approach are both acceptable; c) A site survey is provided in Appendix A to facilitate design work. The new bridge alignments are both anticipated to be in the same general location of the existing bridges. Additional survey work is at the Proponents expense; d) Foundations, abutments, anchors, and structure design shal respect the geotechnical report provided as Appendix B. Any additional geotechnical investigations to satisfy the design engineers wil be done at the Proponents expense; e) Loading requirements shal be considered as use by pedestrians only. Snow load capacity shal be calculated using Appendix C using the elevations provided. Bridge design should allow for local heavy snow loading and melting with seasons; f) Designs offering integration with the surrounding environment and enhanced or unique aesthetic qualities that promote exceptional resort experiences are encouraged. Examples of design precedents are provided in Appendix D, al designs that meet the requirements within the RFP will be considered; g) Design shall ensure the bridge can connect to the existing trail at each end; h) All design work by the Proponent must be completed by a registered professional engineer; i) Materials should be very low maintenance, long lasting, and where possible sourced locally with consideration for environmenta ly friendly products; j) 2020 Engineered Bridge Report is included as Appendix E; k) 2024 Hydrological Technical Memo is available as Appendix F.
Post-Bid
Bridges / Tunnels
$500,000.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 17, 2025
September 1, 2025
Rainbow Lake Trail, Whistler, BC
Related To This Project
Whistler, BC
Bid Date: Jul 14 2025
Whistler, BC
Bid Date: Jul 10 2025
Whistler, BC
Bid Date: Aug 13 2025
Whistler, BC
Bid Date: Sep 12 2025
Whistler, BC
Bid Date: Aug 13 2025
Whistler, BC
Bid Date: Aug 20 2025
Whistler, BC
Bid Date: Oct 07 2025
Whistler, BC
--
Whistler, BC
Bid Date: Jun 25 2025
Whistler, BC
Bid Date: Jun 13 2025
Whistler, BC
Bid Date: Jun 05 2025
Whistler, BC
Bid Date: Jun 11 2025
The Best Gift for Your Business? Seeing the Future of Construction.
We’re unwrapping exclusive project leads early this year. Gain instant access to commercial data that keeps you steps ahead of the competition. Sign up today to see the projects others won't discover until they're already spoken for.