BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 16, 2025 at 8:00 PM

Updated July 17, 2025

Site work and paving for a mixed-use development in Homer Township, Michigan. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

0.98 mi of hot mix asphalt cold milling and resurfacing, concrete curb and gutter, signing and pavement markings on Monroe Road from Sturgeon Road to Eastman Road in the city of Midland, Midland County. This is a Local Agency project. Net classification required for this project is 770 Cb or 770 Ea In addition to the above minimum prequalification requirement for prime contractors this project includes a subclassification of Ea. If the prime contractor is not prequalified in this subclassification it must use a prequalified subcontractor. This subcontractor must be designated prior to award of the contract to the confirmed low bidder Control Sec Job No Federal No STUL 56000 215716A 25A0688 7% DBE Participation Required. Completion Date: 10/31/2025 MIDOT - 2507 042 - Hot Mix Asphalt Cold Milling and Resurfacing, Concrete Curb and Gutter, Signing and Pavement Markings on Monroe Road Question Deadline 07/04/2025 All inquiries must be made by E-mail through the electronic proposal system at MILogin for Third Party's MDOT e-Proposal application. All inquiries concerning the plans and proposal for this project are to be directed to: Brent Schriner

Award

Roads / Highways

$729,075.00

Public - State/Provincial

Paving, Site Work

30

3

3

7

Subscribe For Documents

21 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
186
Active Projects
105
Bidding Soon
1,266
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 11, 2025

August 11, 2025

Project location map

Monroe Rd, Homer Township, MI

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.