BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 16, 2025 at 8:00 PM

Updated July 24, 2025

Demolition, site work and new construction of a fire / police facility in Burlington, Massachusetts. Completed plans call for the demolition of a fire / police facility; for the construction of a 39,000-square-foot, two-story above grade fire / police facility; and for site work for a fire / police facility.

Submissions Shall Not Be Emailed, Mailed, or Faxed. Filed Subcontractor Categories Are: Elevators. The Town of Burlington Reserves the Right to Reject Any and All Submissions, to Waive Any Informality in Prequalification, and to Accept or Reject Submissions as Determined in the Best Interests of the Town. The Project Has an Estimated Construction Cost of $32.9m.

Post-Bid

Fire / Police

$32,901,865.00

Public - City

Demolition, New Construction, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
566
Active Projects
259
Bidding Soon
3,887
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 23, 2025

March 23, 2026

Project location map

45 Center St, Burlington, MA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.