BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 5, 2025 at 8:00 PM

Updated August 6, 2025

Site work and outdoor lighting for a water / sewer project in Riverton, Wyoming. Working plans call for site work for a water / sewer project; and for outdoor lighting for a water / sewer project.

**As of August 5th, 2025, bids were rejected and will rebid early Winter or December, 2025.** The project will include the installation of a 1,000 gallon AvGas self-serve fuel tank, which includes a 1,000 gallon UL 2085 tank, skid equipment, point of sale, bollards, overhead light, and electrical connection/boring. Bids will be evaluated and awarded to the lowest responsive bidder. Question Deadline 07/11/2025 This specification covers the procurement, fabrication, shipping off-loading, placement and performance specifications of a new direct to aircraft aviation fueling system at the Central Wyoming Regional Airport (RIW) located in Fremont County, Wyoming. The fueling system shall consist of: - One (1) 1,000 Gallon UL2085, Fireguard, Double Wall Steel Aboveground Storage Tank for Bulk storage and direct to aircraft dispensing of Avgas (100LL). The pumping system shall include; - One (1) 200 (+/- 20) GPM remote pump and filtration skid (Avgas -100LL). The fueling system shall include all the necessary pump, valves and components to provide an operational system in accordance with industry standards for aviation fueling and comply with federal, state and local codes. These specifications are minimum standards and the engineer may consider approved equals. Price shall include all fees, permits, training and inspections required for the fueling systems to be operational. All equipment provided for this system shall be new, no used or refurbished equipment shall be permitted. B. Scope of Work: The fueling system project at the airport will consist of: Avgas (100LL) System - 1,000 Gallon UL2085, Fireguard, Double Wall Steel Aboveground Storage Tank for the storage of Avgas (100LL) with remote pumping and filtration skid capable of off-load transports vehicles, and dispense directly to aircraft as noted below. The pumping system shall incorporate a 112 Gallon Static Relaxation Vessel and the Avgas (100LL) shall pass through the Static Relaxation Vessel going into the storage tank and when dispensing to aircraft. 1. Flow Rates : Offloading from fuel transport vehicles: 200 gpm Single Point fueling: 120 gpm Overwing fueling: 25-30 gpm

Final Planning

Water / Sewer

$618,557.00

Public - City

Outdoor Lighting, Site Work

28

22

2

4

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 17, 2025

February 5, 2026

Project location map

4800 Airport Rd, Riverton, WY

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.