Site work and renovation of a mixed-use development in Saint Gabriel, Louisiana. Completed plans call for the renovation of a playground / park / athletic field; and for site work for a playground / park / athletic field.
East Iberville HS Baseball/Softball Complex The Work of Project is defined by the Contract Documents and consists of the following (but not limited to): 1. New Artificial Turf 2. Sports Equipment 3. New metal buildings 4. New Paving 5. New grading 6. New batting cages 7. New scoreboards 8. Chain link Fencing It shall be the responsibility of the CONTRACTOR to verify measurements of the installation areas as well as to provide all labor, materials, equipment, tools expertise, and supervision necessary for the complete installation of a vertical-to-horizontally draining synthetic turf system. Project work is defined by the Contract Documents (i.e. construction drawings and specifications) and consists of, but is not limited to, the following items: The project consists of converting the existing natural turf within the limits of the East High School baseball and softball perimeter fences including underground drainage, structural base, shock pad, synthetic turf with associated infill turf. The new 6", 8" and 12" perforated, corrugated, double-wall HDPE pipes in stone filled trench are to be installed next to the inside of the baseball and softball perimeter fences. 1. Locate and secure clearance for all project specific utilities. It is solely the responsibility of the CONTRACTOR to repair damaged utilities. 2. The elevations for the athletic fields are shown on the attached drawings. The grading plan accompanying these drawings shall be followed to ensure positive drainage flow. The CONTRACTOR shall bear the responsibility of verifying these elevations. 3. All surveying for field placement and layout is the responsibility of the CONTRACTOR. 4. CONTRACTOR shall remove vegetative layer, remove and dispose of any other material deemed undesirable. (i.e. existing natural grass on playing field will be removed by the CONTRACTOR.) CONTRACTOR shall remove all other material deemed undesirable as per construction drawings and specifications. 5. Excavate to depth required to accommodate required cross-section, slope and finished grades. 6. Prior to installing specified structural base, contour, slope, rough grade, and compact sub-base, within limits of field inside the track oval, to specified grades, as per construction drawings and specifications. 7. Install a 3.5 inch thick poured in place concrete structural base with a minimum 3,000 psi concrete with keyway expansions joints spaced at 15 feet on center in one direction and saw cuts in the perpendicular direction at 10 feet on center; OR ALTERNATIVELY install a poured in place structural base with minimum 3,000 psi concrete poured into a minimum 40 millimeter deep structural grid as detailed in performance criteria below. 8. Install a perimeter turf anchoring encompassing the perimeter of areas to receive synthetic turfing with pressure treated nailer approved for ground contact, to match finish grade of concrete base. Pressure treated nailer to be attached to poured in place concrete support member as detailed in construction drawings. 9. Home plate to be installed and anchored into the base of the field. 10. Install pitcher's mound in accordance to standard high school dimension of 60' 6" from the front of the rubber to the back tip of home plate 11. Install the perimeter collector trenches and tie in as shown on the construction drawings. 12. Furnish and install a shock pad/drainage blanket system that meets the performance requirements of the preapproved products detailed below. 13. Install nonfill synthetic turf system, tufted to a maximum 1.25-inch height, having 100% polyethylene fibers with a dimensionally stable primary backing that meets the performance requirement as detailed herein this bid package. 14. Install all tufted and inlaid lines and markings as shown in the construction drawings. 15. Install GeoCool Natural Cooling Additive, Envirofill, or other approved equal. Infuse infill mixture into artificial turf in multiple applications. 16. Clean site per owner's instructions and dispose of any unwanted materials. 17. Repair any damage to areas, including parking lots, staging areas, outfield grass or utility lines, or other that may have occurred and restore site to pre-project condition. Addendum #1 has been issued as of 6-30-2025.
Award
Playgrounds / Parks / Athletic Fields
$5,600,000.00
Public - County
Renovation, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 10, 2025
September 8, 2025
3285 LA-75, Saint Gabriel, LA
Related To This Project
Saint Gabriel, LA
Bid Date: Jul 15 2025
Saint Gabriel, LA
Bid Date: May 13 2026
Saint Gabriel, LA
Bid Date: May 13 2026
Saint Gabriel, LA
Bid Date: Dec 11 2025
Saint Gabriel, LA
Bid Date: Feb 10 2026
Saint Gabriel, LA
Bid Date: Apr 21 2026
Saint Gabriel, LA
Bid Date: May 28 2026
Saint Gabriel, LA
Bid Date: Jun 04 2026
Saint Gabriel, LA
Bid Date: Jun 26 2025
Saint Gabriel, LA
Bid Date: Jun 12 2025
Saint Gabriel, LA
Bid Date: Apr 15 2025
Saint Gabriel, LA
Bid Date: Mar 27 2025
Saint Gabriel, LA
Bid Date: Mar 27 2025
Saint Gabriel, LA
Bid Date: Nov 26 2024
Saint Gabriel, LA
Bid Date: Oct 29 2024
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.