BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 4, 2025 at 8:00 PM

Updated September 5, 2025

Site work for a bridge / tunnel in Groton, Connecticut. Completed plans call for site work for a bridge / tunnel.

**As of August 11, 2025, this project has not yet been awarded. A timeline for the award has not yet been established.** Project Description: Repair and maintain existing box culvert Bridge No. 058007 Thomas Road over Birch Plain Creek. Repair existing bridge metal beam rails and baseplates. Stabilize the southern side of the structure's wingwalls with modified riprap within the existing project limits. Project Scope subject to the terms of CTDEEP Certificate of Permission 202408774-COP. The Town of Groton reserves the right to waive any formalities or to reject any or all bids.

Award

Bridges / Tunnels

$90,532.00

Public - City

Site Work

14

8

6

3

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
579
Active Projects
260
Bidding Soon
3,871
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 17, 2025

August 18, 2025

Project location map

Thomas Rd, Groton, CT

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.