Site work for a water / sewer project in Cold Spring, New York. Completed plans call for site work for a water / sewer project.

**As of September 22, 2025, this project has not yet been awarded. A timeline for the award has not yet been established.** Hudson River Drainage Chamber Rehabilitation - Electrical If you have any questions, please feel free to contact Vanessa Soto via the Discussion Forum tab in PassPort o Site Access: o Barge access via the Hudson River o Safe and secure pedestrian access to the HRDC from the Breakneck Ridge Trailhead as directed by the DEP o Temporary Site Setup: o Field Trailer o Security fencing on jersey barriers o Sedimentation and Erosion control o Exclusion fencing for animals o Architectural and structural rehabilitation of the HRDC superstructure (door, roof, exterior cleaning/graffiti removal building masonry and brick, South Wing Wall, and interior chambers) o Improvement to drainage system (manholes - rock drains and French drain at South Wing Wall) o Provide temporary power for construction activities o Removal and replacement of existing blow-off valves inside HRDC: o Two 40" Blow Off Valves; (1) Bronze and (1) Cast Iron, with hydraulic actuator. o Two 12" Gate Valves; (1) Bronze and (1) Cast Iron, with hydraulic actuator. o Blow-off valves inside HRDC will be comprised of: o 40" Knife Gate and an 800mm Plunger Valve in series in the '40" line'; and o 12" Knife Gate and a 250mm Plunger valve in series in the '12" line' o New local control panels for blowoff valves o New instrumentation and controls of blow-off valves on main building level o Remove existing gate valve and fitting in Cap Chamber o Install new air relief valve on existing shaft cap, during the unwatering period of the Catskill Aqueduct o Clean existing pressure relief drains in the HRDC main building, cap chamber and valve chamber o Clean by rodding and/or water jetting o If directed by the Engineer, install new drainage system along South and East wall of the HRDC o Drill vertical into rock, install piping to collect water to mitigate water intrusion o Access to the underground chambers o Valve Chamber includes ships ladders, grating platforms at 3 levels, safety railing and safety gates, and pole ladder o Cap Chamber includes stairs, grating at 2 levels, and safety railings o Temporary Sheet Pile Cofferdam to support sediment removal and concrete repairs of the waterways system o Concrete rehabilitation of the stilling chamber and waterway system o Moodna access road o New gate at road entrance o Improve Moodna access road, widen and new drainage swale o New culverts in three locations o Temporarily unwater HRDC shaft and Moodna Shaft during CA shutdowns for HRDC Valve Replacement o Infiltration test. o Temporarily unwatering system to lower water level in the Moodna Access Shaft during CA shutdowns o Moodna water levels to be lowered in parallel with HRDC water levels o Temporary storage tank on site to hold refill water o Small pH treatment system to balance water pumped from Moodna shaft o Site improvement, level to install temporary unwatering system o Concrete crack repairs within Moodna Access Shaft o Temporarily unwatering system to lower water level in the Moodna Access Shaft during CA shutdowns o Section view of temporary piping and pumps to be installed in Moodna Access Shaft for unwatering o May need to increase the opening of shaft cap to handle larger diameter piping and pumps due to infiltration encountered in the shaft o Final Site Restoration of HRDC o Permanent Black Metal fence o New driveway with concrete pavers o Sliding vehicular gate o Crash gate o Stone perimeter o Vehicular access connection to a planned bridge over the Metro North train tracks north of the HRDC site o 480V DEP Transformer o 25 KVA 277/480 Portable Generator o HRDC Grounding o Core penetration through stone masonry wall Please be advised that the Question Deadline has been extended to July 14, 2025, close of business. All questions must be submitted in the “Discussion with Buyer” forum in PASSPort.

Bid Results

Water / Sewer

$4,875,000.00

Public - City

Site Work

22

49

6

8

Subscribe For Documents

29 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
882
Active Projects
484
Bidding Soon
6,851
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 20, 2025

October 22, 2025

Project location map

472 Bear Mountain-Beacon Hwy, Cold Spring, NY


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.