Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published April 29, 2026 at 8:00 PM
Updated May 21, 2026
Site work and paving for a civil project in Oklahoma City, Oklahoma. Working plans call for site work for a bridge / tunnel; for paving for a bridge / tunnel; road / highway; road / highway; and water / sewer project.
Project Description: MC-0594, Pedestrian Bridge North E.K. Gaylord Boulevard from the Santa Fe Garage east to Park Avenue; Estimated Cost of Construction $4,837,000. The pedestrian bridge is designed to span approximately ninety feet over E.K. Gaylord Avenue, connecting the Park Avenue underpass with the Santa Fe Parking Garage. This 8-foot-wide x 12- foot-high bridge will enhance pedestrian safety and improve accessibility. The bridge tower structure on the east side of E.K. Gaylord Avenue will be located immediately adjacent to the existing BNSF Railroad right-of-way. The proposed foundation design will be coordinated with the existing private utility conduit locations to leave them in place. The bridge foundations on the west side of E.K. Gaylord Avenue will be located immediately adjacent to the existing Santa Fe Parking Garage. Paving and streetscape improvements include relocating streetlight power conduits and pull boxes; storm sewer and inlets; removal of the existing median. Permanent closure of the easternmost northbound lane of E.K. Gaylord Avenue from the tower structure south to the north side of the Main Street intersection. Phasing of construction will be so access to the Santa Fe Parking Garage entrance is continuously open during construction. A minimum one lane of through traffic in each direction will also be required throughout construction with the exception of short-term night or weekend closures as needed
Pre-Construction/Negotiated
Bridges / Tunnels
$4,837,000.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 9, 2025
July 27, 2026
N E K Gaylord Blvd, Oklahoma City, OK
Related To This Project
Oklahoma City, OK
--
Oklahoma City, OK
Bid Date: Jul 14 2025
Oklahoma City, OK
Bid Date: Sep 30 2025
Oklahoma City, OK
Bid Date: Aug 26 2025
Oklahoma City, OK
Bid Date: Jul 09 2025
Oklahoma City, OK
Bid Date: Jul 16 2025
Oklahoma City, OK
Bid Date: Jul 22 2025
Oklahoma City, OK
Bid Date: Jul 16 2025
Oklahoma City, OK
Bid Date: Aug 15 2025
Oklahoma City, OK
--
Oklahoma City, OK
Bid Date: Aug 13 2025
Oklahoma City, OK
Bid Date: Jun 30 2025
Oklahoma City, OK
Bid Date: Jun 25 2025
Oklahoma City, OK
Bid Date: Jun 27 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
