BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 16, 2025 at 8:00 PM

Updated August 17, 2025

Renovation of a military facility in Oklahoma City, Oklahoma. Completed plans call for the renovation of a military facility.

July 10, 2025 Update: SIR Amendment 0001 is issued which extends the proposal due date to August 15, 2025 by 3 p.m. Central Time. Note that only proposals submitted by contractors that attended the site visit on July 2, 2025 and signed in will be considered responsive. See the attachments for SIR Amendment 0001 titled "6973GH-25-R-00160 0001 FE." Please see the attached /SIR along with all 12 attachments. THIS PROCUREMENT IS 100 SET ASIDE FOR SMALL BUSINESS Work Order # 2025-003967 The Estimate Price Range: 1,000,000 and 5,000,000 --PLEASE SEE INFO BELOW-- Provide all labor and materials to replace TSP-027 Switchgear MCC IAW Attachment 1(a) and Attachment 1(b). Prospective offerors are required to attend a MANDATORY pre-proposal conference/ to be held at 10:00 a.m. Central Time, July 2nd, 2025 via at the Mike Monroney Aeronautical Center. The conference will be held for the purpose of site investigation and permit general discussions regarding this Screening Information Request. IMPORTANT NOTICE: Proposals from offerors who did not attend the pre-proposal conference WILL NOT be considered for award. The project will upgrade the existing electrical main service equipment, Motor Control Centers, and some secondary switchboards downstream from the main service. The work will be accomplished in different phases with scheduled power outages. The project consists of a Base Bid and ten (10) bid options: 1. Base Bid: a. Providing and installing temporary power substations to provide temporary power as needed during the construction. b. Replacing the building's 4000A main-tie-main switchgear in its entirety. c. Re-connecting the feeder branch circuits. d. Installing 2 busduct tap boxes. e. Replacing existing motor starters at the 800A Motor Control Center. f. Replacing a 1600A switchboard. g. Replacing a 400A switchboard. Re-using the existing feeder branch circuits conductors. The conductor sizes range from #2 AWG to 500Kcmil AWG. Offerors are allowed to send a maximum of TWO (2) individuals to represent their proposal (to include proposal team member, if applicable). Please advise the Contracting Officer, Neil Amaral, at neil.s.amaralfaa.gov in writing of your intent to attend by 3:00 p.m. Central Time, June 27th, 2025. Telephone requests will NOT count as notification of attendance. Offerors are required to submit all they may have regarding this requirement/specifications/plans in writing to the Contracting Officer by July 11th, 2025, 3:00 p.m. Central Time. E-mail to neil.s.amaralfaa.gov. received after that date, together with any generated at the , will be answered in writing as soon as possible following the . *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Post-Bid

Military

$5,000,000.00

Public - Federal

Renovation

9

9

24

4

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
127
Active Projects
71
Bidding Soon
706
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 15, 2025

September 29, 2025

Project location map

To Be Determined, Oklahoma City, OK

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.