BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 17, 2025 at 8:00 PM

Updated July 18, 2025

Site work and paving for a sidewalk / parking lot in Rocky Mount, Virginia. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

The Town of Rocky Mount is soliciting competitive sealed bids from qualified providers for installation of approximately eight hundred (800) linear feet of concrete sidewalk running east to west along the west bound lanes of Tanyard Road and ending at the intersection of Pell Avenue in front of Franklin County High School. The new sidewalk will run from the end of the newly constructed sidewalk in front of the Bank of Botetourt located at 875 Tanyard Road west to the Pell Avenue intersection, including the center island on Pell. Specs for the project include: - The length of the sidewalk is approximately eight hundred (800) feet. - The width of the sidewalk shall be a minimum of five (5) feet. - The depth of the sidewalk shall be a minimum of four (4) inches and meet Virginia Department of Transportation (VDOT) A3 graded concrete. - The interior of the existing curbed triangle island at Pell Avenue is grass. All grass is to be removed and replaced with concrete and detectable warning surfaces installed. - The existing ramp on the west end of the Pell Avenue intersection will need to be replaced and detectable warning surfaces installed. - Detectable warning surfaces will be placed at all other ramp areas. - The disturbed area around the newly installed sidewalk will be backfilled and reseeded as needed. - Wayfinding sign located Pell Avenue to be relocated in consultation with the Town. - A flagging plan will be necessary for this project. Contact Mr. Mark W. Moore, Assistant Town Manager, at (540) 483-0907 or mmoore@rockymountva.org with any questions. Since the location of this sidewalk is largely in front of Franklin County High School, all work must be completed before school begins on August 21, 2025. The Town reserves the right to reject any or all bids submitted, and to waive any informality in the proposals. The right is also reserved to award the contract where it appears to be in the best interest of and best interest to the Town. The Town reserves the right to revise or amend this IFB prior to the date set for receipt of the proposals. The date set for receipt of proposals may be changed if deemed necessary by the Town. Any revisions and/or amendments will be in the form of an addendum to this IFB. The Town reserves the right to award a contract by individual items, in the aggregate, or in combination thereof, or to reject any or all bids received whenever such a rejection or waiver is in the best interest of the Town. Awards may be made to as many bidders as deemed necessary to fulfill the anticipated requirements of Rocky Mount. Questions deadline: 06/23/2025

Award

Sidewalks / Parking Lot

$164,000.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
221
Active Projects
103
Bidding Soon
1,225
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 30, 2025

July 30, 2025

Project location map

Tanyard Rd, Rocky Mount, VA


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.