BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 11, 2025 at 8:00 PM

Updated August 12, 2025

Renovation of a water / sewer project in Petrolia, Pennsylvania. Completed plans call for the renovation of a water / sewer project.

For the following projects: Petrolia and Bruin Treatment Facilities Emergency Standby Generators Installation Each Proposal shall be accompanied with a certified check or Bidders Bond in the amount of ten percent (10%) of the proposal, in favor of Bear Creek Watershed Authority. for the Con- Bear Creek Watershed Authority reserves the right to reject any or all formality in bids received. If, during the interval between advertisement and the submission of bids, a prospective Bidder shall find any discrepancy, omission, contradiction or ambiguity in the Contract Documents or any provision which is in conflict with a Federal or State law or regulation or with a law or ordinance of a municipality or other local authority, he shall notify the Owner and Engineer in writing at once. If the Contract Documents are in error or require clarification, correction or clarification will be made in a bidding supplement to the Contract Documents, copies of same to be sent simultaneously to all prospective Bidders by the Engineer. A Maintenance Guarantee and Bond wili be required. Unless otherwise specified elsewhere in the Proposal documents, the Contractor shall agree for himself, his heirs, executors, administrators, successors and assigns to maintain all the work done under this Contract in good condition for a period of two years from the date of final acceptance of the same, the Owner being the judge of the condition of the work; and upon the acceptance of the completed work and before the surety which has furnished the Performance Bond is released, the Contractor, at no additional cost to the Owner, shall furnish a Maintenance Bond executed by a responsible corporate surety company in the full amount of the final cost of the Owner or in a lesser amount if so stipulated elsewhere in the Contract Documents. If any person contemplating submitting a Proposal is in doubt as to the true meaning of any part of the Drawings, Specifications or other contract Documents, or if he finds discrepancies in or omissions from the Drawings or Specifications, he may submit a written request to the Engineer for an interpretation or correction thereof. The person submitting the request will be responsible for its prompt delivery to the Engineer. Any interpretation or correction of the documents will be made only by duly issued Addendum and a copy of the Addendum will be mailed or delivered to each person who received a set of the Contract documents. Neither the Owner nor the Engineer will be responsible for any other explanations or interpretations of the Contract Documents. All requests for interpretation must be received by the Engineer at least five (5) days before the date set for bid opening.

Award

Water / Sewer

$165,000.00

Public - County

Renovation

17

14

10

4

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
59
Active Projects
6
Bidding Soon
995
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 3, 2025

August 4, 2025

Project location map

To Be Determined, Petrolia, PA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.