Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published August 22, 2025 at 8:00 PM
Updated August 23, 2025
Site work, asbestos abatement and renovation of a municipal facility in Santa Ana, California. Completed plans call for the renovation of a municipal facility; for site work for a municipal facility; and for asbestos abatement for a municipal facility.
**As of August 22, 2025, this project has not yet been awarded. A timeline for the award has not yet been established.** This project includes abatement of lead and asbestos, removal and replacement of the existing carpet and LVT, painting, door and wall installation, and renovations to the existing kitchen and copy rooms, ADA restroom renovations, plumbing rerouting, power and data rerouting, roller shade installation. (Further details provided in Boilerplate Specs). Question Deadline 07/03/2025 at 5:00 PM PT Online Q&A -Yes Thank You for Your Interest in Bidding This Project. License Requirements - California Class A or B Liquidated Damages - $430 Per Calendar Day Start/Delivery Date September 2025 to March 2026 Project Duration - 140 Working Days This project includes removal and replacement of carpet, LVT and ceramic tile, breakroom cabinet removal and replacement, extending existing walls to full height, restroom remodel with ADA compliance limited to the area of work, tile abatement (see abatement report), water fountain removal and replacement with ADA compliance, and wall demo. Provide new flooring, new cabinets, new plumbing fixtures, new restroom accessories, new led lighting, new power and plumbing, new ADA restroom signage and door, new drinking fountains, and new wall for alcove. Bid Bond - 10.00% Payment Bond - 100.00% Performance Bond - 100.00% tenant improvement of city hall 1st floor housing authority office and ada compliant restroom remodel selective demolition of: - existing finishes - existing electrical - existing non-bearing interior partition - existing plumbing fixtures installation of: - new non-bearing interior partition - new electrical - new fixed ceiling - new floor, wall, door finishes - new plumbing fixtures - new restroom accessories - new millwork - new doors - new breakroom accesories
Bid Results
Municipal
$379,750.00
Public - City
Asbestos Abatement, Renovation, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 21, 2025
August 20, 2025
20 Civic Center Plaza, Santa Ana, CA
Related To This Project
Santa Ana, CA
Bid Date: Jul 25 2025
Santa Ana, CA
Bid Date: Aug 06 2025
Santa Ana, CA
Bid Date: Jul 01 2025
Santa Ana, CA
Bid Date: Aug 29 2025
Santa Ana, CA
--
Santa Ana, CA
--
Santa Ana, CA
Bid Date: Jul 01 2025
Santa Ana, CA
Bid Date: Jul 09 2025
Santa Ana, CA
Bid Date: Jul 09 2025
Santa Ana, CA
Bid Date: Jul 16 2025
Santa Ana, CA
Bid Date: Jul 16 2025
Santa Ana, CA
--
Santa Ana, CA
Bid Date: Jun 26 2025
See the Projects and Companies Shaping 2026 Before Anyone Else
Start the New Year with a clearer view of the construction market. Unlock early access to commercial project data that keeps your pipeline full and your competitors behind. Sign up today for the project and contact data that others won't discover until its too late.
