BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 22, 2025 at 8:00 PM

Updated August 23, 2025

Site work, asbestos abatement and renovation of a municipal facility in Santa Ana, California. Completed plans call for the renovation of a municipal facility; for site work for a municipal facility; and for asbestos abatement for a municipal facility.

**As of August 22, 2025, this project has not yet been awarded. A timeline for the award has not yet been established.** This project includes abatement of lead and asbestos, removal and replacement of the existing carpet and LVT, painting, door and wall installation, and renovations to the existing kitchen and copy rooms, ADA restroom renovations, plumbing rerouting, power and data rerouting, roller shade installation. (Further details provided in Boilerplate Specs). Question Deadline 07/03/2025 at 5:00 PM PT Online Q&A -Yes Thank You for Your Interest in Bidding This Project. License Requirements - California Class A or B Liquidated Damages - $430 Per Calendar Day Start/Delivery Date September 2025 to March 2026 Project Duration - 140 Working Days This project includes removal and replacement of carpet, LVT and ceramic tile, breakroom cabinet removal and replacement, extending existing walls to full height, restroom remodel with ADA compliance limited to the area of work, tile abatement (see abatement report), water fountain removal and replacement with ADA compliance, and wall demo. Provide new flooring, new cabinets, new plumbing fixtures, new restroom accessories, new led lighting, new power and plumbing, new ADA restroom signage and door, new drinking fountains, and new wall for alcove. Bid Bond - 10.00% Payment Bond - 100.00% Performance Bond - 100.00% tenant improvement of city hall 1st floor housing authority office and ada compliant restroom remodel selective demolition of: - existing finishes - existing electrical - existing non-bearing interior partition - existing plumbing fixtures installation of: - new non-bearing interior partition - new electrical - new fixed ceiling - new floor, wall, door finishes - new plumbing fixtures - new restroom accessories - new millwork - new doors - new breakroom accesories

Bid Results

Municipal

$379,750.00

Public - City

Asbestos Abatement, Renovation, Site Work

19

13

2

7

Subscribe For Documents

125 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
655
Active Projects
295
Bidding Soon
3,642
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 21, 2025

August 20, 2025

Project location map

20 Civic Center Plaza, Santa Ana, CA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.