BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 4, 2025 at 8:00 PM

Updated September 5, 2025

Renovation of a clubhouse / community center in Santa Ana, California. Completed plans call for the renovation of a clubhouse / community center.

**As of September 04, 2025, this project has not yet been awarded. A timeline for the award has not yet been established.** This project includes demo of existing finishes, shower partitions, plumbing fixtures, including shower heads and handles, floor drains with associated plumbing, floor-toceiling tiles and backer board, exhaust fan and lighting fixtures, as well as providing new shower partitions, floor-to-ceiling tile on new backer board with tile trim, shower fixtures, including ADA and non-ADA shower heads and handles, floor drains with p-traps and covers, shower accessories, including grab bars, soap dispensers and curtains, exhaust fan and lighting fixtures. This includes providing new plumbing, power, and ducts as required to tie in new to existing systems and capping or terminating unused connections. Liquidated Damages $330 Per Calendar Day Estimated Bid Value $200,000 Start/Delivery Date September to January Project Duration 60 Working Days Online Q&A Yes Q&A Deadline 07/07/2025 5:00 PM (PDT) Requests for interpretation must be submitted online through the PlanetBids Q&A section. Any interpretation or correction of the documents will be made only by an Addendum. This project includes renovating the existing showers at Salgado Community Center which includs removing and replacing the existing tile, backer board, shower. HARD COPIES FOR VERIFICATION ONLY; ELECTRONIC SUBMITTAL IS REQUIRED BY DEADLINE AND HARD COPIES MAY BE ACCEPTED BY COB OR NEXT BUSINESS DAY. Please send the original bid bond, as well as the notarized affidavits, enclosed in a sealed envelope and marked clearly with following information, formatted exactly as below: "SEALED BID BOND FOR PROJECT NO. 23-6039 Salgado Shower Renovations City of Santa Ana Attn.: Jonathon Aguirre ; Public Works Agency; M-11 20 Civic Center Plaza; Santa Ana, CA 92701" For hard copy drop offs, visitors will be routed to deliver in the grey drop box on the 1st floor of Ross Annex across from the Public Works counter. Gentle note: staff will not timestamp or sign any hard copy deliveries as the electronic submittal by the deadline is suffice. This project includes demo of existing finishes, shower partitions, plumbing fixtures, including shower heads and handles, floor drains with associated plumbing, floor-toceiling tiles and backer board, exhaust fan and lighting fixtures, as well as providing new shower partitions, floor-to-ceiling tile on new backer board with tile trim, shower fixtures, including ADA and non-ADA shower heads and handles, floor drains with p-traps and covers, shower accessories, including grab bars, soap dispensers and curtains, exhaust fan and lighting fixtures. This includes providing new plumbing, power, and ducts as required to tie in new to existing systems and capping or terminating unused connections.

Bid Results

Clubhouse / Community Centers

$130,000.00

Public - City

Renovation

89

7

7

Subscribe For Documents

113 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
650
Active Projects
255
Bidding Soon
3,501
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 25, 2025

August 25, 2025

Project location map

706 N Newhope St, Santa Ana, CA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.