Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published September 4, 2025 at 8:00 PM
Updated September 5, 2025
Renovation of a clubhouse / community center in Santa Ana, California. Completed plans call for the renovation of a clubhouse / community center.
**As of September 04, 2025, this project has not yet been awarded. A timeline for the award has not yet been established.** This project includes demo of existing finishes, shower partitions, plumbing fixtures, including shower heads and handles, floor drains with associated plumbing, floor-toceiling tiles and backer board, exhaust fan and lighting fixtures, as well as providing new shower partitions, floor-to-ceiling tile on new backer board with tile trim, shower fixtures, including ADA and non-ADA shower heads and handles, floor drains with p-traps and covers, shower accessories, including grab bars, soap dispensers and curtains, exhaust fan and lighting fixtures. This includes providing new plumbing, power, and ducts as required to tie in new to existing systems and capping or terminating unused connections. Liquidated Damages $330 Per Calendar Day Estimated Bid Value $200,000 Start/Delivery Date September to January Project Duration 60 Working Days Online Q&A Yes Q&A Deadline 07/07/2025 5:00 PM (PDT) Requests for interpretation must be submitted online through the PlanetBids Q&A section. Any interpretation or correction of the documents will be made only by an Addendum. This project includes renovating the existing showers at Salgado Community Center which includs removing and replacing the existing tile, backer board, shower. HARD COPIES FOR VERIFICATION ONLY; ELECTRONIC SUBMITTAL IS REQUIRED BY DEADLINE AND HARD COPIES MAY BE ACCEPTED BY COB OR NEXT BUSINESS DAY. Please send the original bid bond, as well as the notarized affidavits, enclosed in a sealed envelope and marked clearly with following information, formatted exactly as below: "SEALED BID BOND FOR PROJECT NO. 23-6039 Salgado Shower Renovations City of Santa Ana Attn.: Jonathon Aguirre ; Public Works Agency; M-11 20 Civic Center Plaza; Santa Ana, CA 92701" For hard copy drop offs, visitors will be routed to deliver in the grey drop box on the 1st floor of Ross Annex across from the Public Works counter. Gentle note: staff will not timestamp or sign any hard copy deliveries as the electronic submittal by the deadline is suffice. This project includes demo of existing finishes, shower partitions, plumbing fixtures, including shower heads and handles, floor drains with associated plumbing, floor-toceiling tiles and backer board, exhaust fan and lighting fixtures, as well as providing new shower partitions, floor-to-ceiling tile on new backer board with tile trim, shower fixtures, including ADA and non-ADA shower heads and handles, floor drains with p-traps and covers, shower accessories, including grab bars, soap dispensers and curtains, exhaust fan and lighting fixtures. This includes providing new plumbing, power, and ducts as required to tie in new to existing systems and capping or terminating unused connections.
Bid Results
Clubhouse / Community Centers
$130,000.00
Public - City
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 25, 2025
August 25, 2025
706 N Newhope St, Santa Ana, CA
Related To This Project
Santa Ana, CA
Bid Date: Aug 06 2025
Santa Ana, CA
Bid Date: Jul 01 2025
Santa Ana, CA
Bid Date: Aug 29 2025
Santa Ana, CA
--
Santa Ana, CA
--
Santa Ana, CA
Bid Date: Aug 12 2025
Santa Ana, CA
Bid Date: Jul 21 2025
Santa Ana, CA
Bid Date: Jul 01 2025
Santa Ana, CA
Bid Date: Jul 09 2025
Santa Ana, CA
Bid Date: Jul 09 2025
Santa Ana, CA
Bid Date: Jul 16 2025
Santa Ana, CA
Bid Date: Jul 16 2025
Santa Ana, CA
--
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
