Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published September 23, 2025 at 8:00 PM
Updated September 24, 2025
Site work and paving for a civil project in Eden, Arizona. Completed plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.
070 GH 274 070-A-(226)T Globe - Lordsburg Hwy (US 70) (Medicine Way Rd - MP 275.7) The proposed project is located in US 70 about 25 miles southeast of Globe and in the San Carlos Indian Reservation, it consists of construction of an eastbound passing lane and 5 foot shoulder on US 70 from MP 274.57 to MP 275.59, within the SE District, in Graham County. Proposed work consists of placing micro-surfacing on top of asphaltic concrete and aggregate base on the passing lane and fog coat on top of asphaltic concrete and aggregate base on the 5' shoulder. Additional work includes some drainage work, replacing pavement markings and other miscellaneous work. Question Deadline 07/29/2025 Questions Shall Be Submitted Through the Questions and Answers (Q&a) Link Located Within the Corresponding Letting Date and Project Proposal Number Links. the Department May Not Answer All Questions, and Any Decision on Whether a Question is Answered Will Be Within the Sole Discretion of the Department. Any Questions Received Less Than Three Working Days Prior to the Bid Opening Date May Not Be Answered SouthEast District Item # 104175 Engineering Specialist: Rene Teran Pre-qualification: Yes The Application for Contractor Prequalification may be obtained from the Contracts and Specifications website. A proposal guaranty in the form of either a certified or a cashier's check made payable to the State Treasurer of Arizona for not less than 10 percent of the amount of the bid or in the form of a surety (bid) bond for 10 percent of the amount of the bid shall accompany the proposal. Surety (bid) bonds will be accepted only on the form provided by the Department and only from corporate sureties authorized to do business in Arizona. The time allowed for the completion of the work included in the Construction Phase of the contract will be 170 working days AZDOT - System Enhancement (Engineering) - US 70
Award
Roads / Highways
$3,446,236.00
Public - State/Provincial
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 1, 2025
September 30, 2025
US-70, Eden, AZ
Related To This Project
Show Low, AZ
Bid Date: Aug 08 2025
Mesa, AZ
Bid Date: Jul 10 2025
Phoenix, AZ
Bid Date: Jul 22 2025
Flagstaff, AZ
Bid Date: Jul 04 2025
Camp Verde, AZ
--
Camp Verde, AZ
--
Camp Verde, AZ
--
Camp Verde, AZ
--
Davis Monthan AFB, AZ
Bid Date: Jul 17 2025
Sierra Vista, AZ
Bid Date: Jul 17 2025
Buckeye, AZ
Bid Date: Jul 10 2025
Casa Grande, AZ
Bid Date: Jul 01 2025
Parker, AZ
Bid Date: Jul 21 2025
See the Projects and Companies Shaping 2026 Before Anyone Else
Start the New Year with a clearer view of the construction market. Unlock early access to commercial project data that keeps your pipeline full and your competitors behind. Sign up today for the project and contact data that others won't discover until its too late.
