Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published September 23, 2025 at 8:00 PM

Updated September 24, 2025

Site work and paving for a civil project in Eden, Arizona. Completed plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.

070 GH 274 070-A-(226)T Globe - Lordsburg Hwy (US 70) (Medicine Way Rd - MP 275.7) The proposed project is located in US 70 about 25 miles southeast of Globe and in the San Carlos Indian Reservation, it consists of construction of an eastbound passing lane and 5 foot shoulder on US 70 from MP 274.57 to MP 275.59, within the SE District, in Graham County. Proposed work consists of placing micro-surfacing on top of asphaltic concrete and aggregate base on the passing lane and fog coat on top of asphaltic concrete and aggregate base on the 5' shoulder. Additional work includes some drainage work, replacing pavement markings and other miscellaneous work. Question Deadline 07/29/2025 Questions Shall Be Submitted Through the Questions and Answers (Q&a) Link Located Within the Corresponding Letting Date and Project Proposal Number Links. the Department May Not Answer All Questions, and Any Decision on Whether a Question is Answered Will Be Within the Sole Discretion of the Department. Any Questions Received Less Than Three Working Days Prior to the Bid Opening Date May Not Be Answered SouthEast District Item # 104175 Engineering Specialist: Rene Teran Pre-qualification: Yes The Application for Contractor Prequalification may be obtained from the Contracts and Specifications website. A proposal guaranty in the form of either a certified or a cashier's check made payable to the State Treasurer of Arizona for not less than 10 percent of the amount of the bid or in the form of a surety (bid) bond for 10 percent of the amount of the bid shall accompany the proposal. Surety (bid) bonds will be accepted only on the form provided by the Department and only from corporate sureties authorized to do business in Arizona. The time allowed for the completion of the work included in the Construction Phase of the contract will be 170 working days AZDOT - System Enhancement (Engineering) - US 70

Award

Roads / Highways

$3,446,236.00

Public - State/Provincial

Paving, Site Work

71

7

7

Subscribe For Documents

18 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
31
Active Projects
10
Bidding Soon
332
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 1, 2025

September 30, 2025

Project location map

US-70, Eden, AZ


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed