BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 16, 2025 at 8:00 PM

Updated July 17, 2025

Site work and paving for a mixed-use development in Junction City, Oregon. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

10th Avenue Widening Project Work Shall Include, but Not Necessarily Be Limited to: Work Shall Include, but Not Necessarily Be Limited to: Temporary Work Zone Traffic Control, Erosion Control, Asphalt Pavement Saw Cutting, General Excavation, Subgrade, Reinforcement, Storm Sewer, Curb and Sidewalk, Signage, Pavement Removal, Aggregate Base, Fog Coat, Asphalt Paving, Pavement Markings. Question Deadline 07/03/2025 at 12:00 PM PT All Questions Regarding the Plans and Specifications Must Be Submitted to Gary Kaping, Public Works Director in Writing at Gkaping@ci.junction-city.or.us. Class of Project This is a "City" Project and is Subject to Oregon Bureau of Labor and Industries (Boli) Prevailing Wage Rates. If in the Judgement of the Engineer, Additional Information or Interpretation is Necessary Such Information Will Be Supplied in the Form of an Addendum Only Plan Holders Who Are Listed on the City's Plan Holders List Will Be Notified by Email of the Addendum. ENGINEERS ESTIMATE RANGE: $200,000 to $250,000 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Award

Roads / Highways

$181,301.00

Public - City

Paving, Site Work

8

11

6

Subscribe For Documents

26 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
59
Active Projects
18
Bidding Soon
335
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 10, 2025

August 11, 2025

Project location map

E 10th Ave, Junction City, OR

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.