BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 5, 2025 at 7:00 PM

Updated December 6, 2025

Site work for a water / sewer project in Brentwood, California. Completed plans call for site work for a water / sewer project.

** As of October 13,2025, project currently being rescheduled. No definite date for the rebid.** The Project is located at Empire Way, and is described as follows: Extend existing potable, non-potable, and sanitary sewer utilities westward along Empire Avenue through State Route 4 crossings to the Innovation Center Bid Security. The Bid Proposal must be accompanied by bid security of ten percent of the maximum bid amount, in the form of a cashier's or certified check made payable to City, or a bid bond executed by a surety licensed to do business in the State of California on the Bid Bond form included with the Contract Documents. The successful bidder will be required to provide performance and payment bonds, each for 100% of the Contract Price, as further specified in the Contract Documents. Time for Final Completion. The Project must be fully completed within 60 calendar days from the start date set forth in the Notice to Proceed. City anticipates that the Work will begin on or about June 1, 2025, but the anticipated start date is provided solely for convenience and is neither certain nor binding. License and Registration Requirements. 3.1 License. This Project requires a valid California contractor's license for the following classification(s): Class "A". 3.2 DIR Registration. City may not accept a Bid Proposal from or enter into the Contract with a bidder, without proof that the bidder is registered with the California Department of Industrial Relations ("DIR") to perform public work pursuant to Labor Code 1725.5, subject to limited legal exceptions. Instructions to Bidders. All bidders should carefully review the Instructions to Bidders for more detailed information before submitting a Bid Proposal. The definitions provided in Article 1 of the General Conditions apply to all of the Contract Documents, as defined therein, including this Notice Inviting Bids. 11. Retention. 11.1 Percentage. The percentage of retention that will be withheld from progress payments is 5%. ** bid date info : If the window is not staffed, you must contact the City Clerk by dialing 5440, using the phone at the third floor window, and hand deliver it to the City employee answering the door. Question Deadline 07/08/2025 at 4:00 PM PT Questions or requests for clarifications regarding the Project, the bid procedures, or any of the Contract Documents must be submitted in writing to Vatsal Patel, Engineering Manager, at VPatel@brentwoodca.gov

Bid Results

Water / Sewer

$2,451,506.00

Public - City

Site Work

20

9

22

4

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
494
Active Projects
165
Bidding Soon
3,441
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 4, 2025

June 8, 2026

Project location map

Empire Ct, Brentwood, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.