Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published September 9, 2025 at 8:00 PM
Updated September 10, 2025
Renovation of a municipal facility in Rolla, Missouri. Completed plans call for the renovation of a municipal facility.
Base Bid Work includes furnishing all labor, materials, and services necessary for selective demolition, asbestos remediation, removal and storage of on-site room furnishings. The Work also includes installation of the following: new flooring materials, wall construction, owner furnished systems furniture, ceiling grid and tiles, and interior storefront door assemblies. Work also includes installation of fire sprinklers, air diffusers, data access points, receptacles, occupancy sensors, and light fixtures. 2. Project contains one Alternate. Alternate No. 1 includes installation of New Stone Flooring. Refer to Section 012300 "Alternates" for additional information MBE 10%, WBE 10%, and SDVE 3%. Phase 1: Area of Work includes rooms labeled 119 Shipping and Receiving, 119A Publications, 119B Storage, 116 Corridor, and 118 Corridor. Work consists of moving furniture out of the areas of work prior to construction and back in after construction, as directed by Owner; demolition of flooring, wood casework and countertop, and interior window, and asbestos abatement; installation of new carpet tiles, concrete floor polish, vinyl wall base, metal stud walls, gypsum board, interior paint, and owner furnished systems furniture; selective modification of ceiling grid, fire protection, thermostat, air diffusers, receptacles, and data access points as needed. This phase shall be substantially complete, ready for occupancy within 35 working days of commencement of construction. Phase 2: Area of Work includes rooms labeled 121 Graphics Studio and 121A Storage. Work consists of moving furniture out of the areas of work prior to construction and back in after construction, as directed by Owner; demolition of flooring, removal of existing electrical floor boxes, and asbestos abatement; installation of new carpet tiles, vinyl wall base, interior paint, owner furnished systems furniture, power and data for systems furniture. Phase 1 and 2 may proceed simultaneously as needed to achieve the most efficient construction schedule to accommodate the asbestos abatement phasing. This phase shall be substantially complete, ready for occupancy within 70 working days of commencement of construction. 3. Phase 3: Area of Work includes rooms labeled 101 Lobby, 101A Gallery, 101B Gallery, 102 Corridor, and 103 Office. Work consists of moving furniture out of the areas of work prior to construction and back in after construction, as directed by Owner; demolition of systems furniture, flooring, metal stud walls, wood doors, and acoustic ceiling tiles; asbestos abatement; installation of new luxury vinyl tile, vinyl wall base, interior paint, service window, acoustic ceiling tile, and suspended grid T-bar; relocation of fire protection, thermostats, receptacles, and light fixtures as needed. Work of Phase 3 shall not commence until Phase 1 and 2 are substantially complete. This phase shall be substantially complete, ready for occupancy within 150 working days of commencement of construction
Award
Municipal
$380,100.00
Public - State/Provincial
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 5, 2025
September 4, 2025
111 Fairgrounds Rd, Rolla, MO
Related To This Project
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
