BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 16, 2025 at 8:00 PM

Updated February 24, 2026

Site work and paving for a transportation facility in Fletcher, North Carolina. Completed plans call for site work for a transportation facility; and for paving for a transportation facility.

Taxiway A Rehabilitation and RON Parking All Contractors and Subcontractors are hereby notified that they shall have proper Contractors licenses as required by the state laws governing their respective trade and discipline of work in the state where this Project is located. Contractors must be listed on the NCDOT Prequalified list as a bidder or Prime to bid on this project and prequalified by the NCDOT to perform the work pertaining to their specific scope of work in the contract. The prime contractor for the project must be prequalified by the NCDOT as a prime. This project has a goal of 10.38% of the total dollar value of the contract and is to be performed by DBE Certified Subcontractors. Bids submitted by Contractors not meeting the above bidding requirements at the time of the bid opening may be deemed unresponsive by the Authority. Additional information regarding the Authoritys rules, requirements, and guidelines pertaining to this bid are provided in the full Invitation to Submit Bid as part of the Issued for Bid Documents.

Post-Bid

Transportation Terminals

$1,000,000.00

Public - State/Provincial

Paving, Site Work

152

13

43

4

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
51
Active Projects
3
Bidding Soon
778
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 18, 2025

September 16, 2025

Project location map

61 Terminal Dr, Fletcher, NC

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.