Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published June 24, 2025 at 8:00 PM
Updated June 25, 2025
New construction of an office development in Louisville, Kentucky. Completed plans call for the construction of an office development.
The Corps of Engineers Louisville District is soliciting comments from the construction community addressing the potential use of Project Labor Agreements (PLAs) from large scale construction projects (exceeding $35 million) for projects consisting of interior and exterior modernization, renovation, and repair of existing residential/commercial construction projects. This project will construct a one-story new chilled water District Cooling Plant (DCP), approximately 17,135 SF. There will be a Construction option of a new parking area to replace existing parking that will be lost due to the boundaries of the new building. This project will be located in Area A of Wright Patterson Air Force Base (WPAFB). OH. The DCP will be an unoccupied one-story building. The exterior façade is to be pre-cast panels. The DCP will consist of four 675-ton chillers to provide for the existing 2000 tons of load with N+1 capacity. Space, but not equipment, will be provided for the 500-ton energy recovery chiller for the ISF and for one additional 675-ton chiller. Electrical switchgear, transformers, and cabling will be installed for the four base 675-ton chillers. Space for transformers, switchgear, and conduits will be installed for the future 500-ton ISF chiller and the additional future 675-ton chiller. The cooling towers will be stainless steel, open crossflow units with above ground basins to match chiller capacity at N+1. Space will be provided for future chiller tower additions. Water softening treatment will be installed in the DCP and will feed the DCP and will back feed existing facilities. Facilities will be designed as permanent construction in accordance with the DoD Unified Facilities Criteria (UFC) 1-200-01, General Building Requirements and UFC 1-200-02, High Performance and Sustainable Building Requirements. This project will comply with DoD antiterrorism/force protection requirements per UFC 4-010-01. Facility-Related Control Systems will be designed IAW with Unified Facilities Criteria (UFC) 4-010-06 Cybersecurity of Facility-Related Control Systems Sep 2016, and DFARS 252.204-7012 Safeguarding Covered Defense Information and Cyber Incident Reporting.
GC Bidding
Office
Public - Federal
New Construction
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 7, 2025
January 7, 2026
To Be Determined, Louisville, KY
Related To This Project
Louisville, KY
Bid Date: Jul 23 2025
Louisville, KY
--
Louisville, KY
Bid Date: Jul 15 2025
Louisville, KY
--
Louisville, KY
Bid Date: Jul 10 2025
Louisville, KY
Bid Date: Feb 04 2026
Louisville, KY
Bid Date: Jul 15 2025
Louisville, KY
--
Louisville, KY
Bid Date: Jul 09 2025
Louisville, KY
Bid Date: Jul 07 2025
Louisville, KY
Bid Date: Jul 03 2025
Louisville, KY
Bid Date: Jul 09 2025
Louisville, KY
--
Louisville, KY
Bid Date: Jul 03 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
