Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published September 2, 2025 at 8:00 PM
Updated September 3, 2025
Site work for a water / sewer project in Independence, Kentucky. Completed plans call for site work for a water / sewer project.
The OWNER reserves the right to reject any or all bids, to waive informalities and to negotiate with the apparent lowest, responsive, responsible bidder to such extent as may be in the OWNER'S best interest. The project generally consists of, but is not limited to providing all labor, equipment, materials, supplies, tools, and supervision necessary to complete the installation of approximately 515 linear feet of 2" PVC low-pressure force main, 2,415 linear feet of 8" gravity sewer, reconnection of all existing sewer laterals, and abandonment/removal of existing septic systems as shown on the Contract Documents prepared by Palmer Engineering. The Work is located in Independence, Kentucky within the Owner's service area in Kenton County, Kentucky. Bids shall be on a unit price basis. All questions regarding the bidding of this project MUST be sent via email to Brandy Miller, SD1 Procurement Manager, at bmiller@sd1.org. Contractor and all Subcontractors will be required to conform to the labor standards set forth in the Contract Documents. Effective immediately, building materials, fixtures, or supplies purchased by construction contractors of Sanitation District No. 1, which will be permanently incorporated into a structure or improvement to real property, or will be completely consumed, in fulfilling a construction contract for the purpose of furnishing water or sewer services to the general public, are exempt from KY sales tax by KRS 139.480. Contractor agrees that the Contract price for this project shall not include sales tax on exempt building materials, fixtures, or supplies. Bidders shall provide bid security (C-430 or equivalent) in amount to ten percent (10%) of the base bid and proof of qualifications to perform the Work as described in the Instructions to Bidders. Bidders must comply with all statutory requirements in accordance with the Instructions to Bidders. The Successful Bidder shall furnish a 100 percent (100%) Performance Bond and a 100 percent (100%) Payment Bond with a Surety company satisfactory to the OWNER using AIA document A312, EJCDC documents C-610 and C-615, or equivalent. The OWNER reserves the right to reject any or all bids, to waive informalities and to negotiate with the apparent lowest, responsive, responsible bidder to such extent as may be in the OWNER'S best interest. Question Deadline 07/08/2025 at 4:00 PM ET
Award
Water / Sewer
$863,232.00
Public - State/Provincial
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 22, 2025
August 21, 2025
Multiple Locations, Independence, KY
Related To This Project
Independence, KY
Bid Date: Jul 10 2025
Independence, KY
Bid Date: Jul 24 2025
Independence, KY
Bid Date: Sep 18 2025
Independence, KY
Bid Date: Aug 26 2025
Independence, KY
Bid Date: Sep 25 2025
Independence, KY
Bid Date: Aug 18 2025
Independence, KY
Bid Date: Sep 04 2025
Independence, KY
Bid Date: Sep 04 2025
Independence, KY
Bid Date: Jun 11 2025
Independence, KY
Bid Date: May 15 2025
Independence, KY
Bid Date: May 15 2025
Independence, KY
Bid Date: Apr 28 2025
Independence, KY
Bid Date: Apr 17 2025
Independence, KY
Bid Date: Apr 24 2025
Independence, KY
Bid Date: Mar 27 2025
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
